# Assam Chief Minister Lays Foundation for Rs 48,000 Crore Thermal Power Plant in Dhubri

> A 3,200 MW ultra-supercritical power plant involving an investment of Rs 48,000 crore is underway in Assam's Chapar, creating thousands of local jobs.

**Type:** article · **Category:** Assam · **Published:** 2026-09-20 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/assam/dhubri-men-48-000-karora-rupaye-ke-tharmala-pavara-planta-ka-shilanyasa-assam-ko-milenge-25-000-rojagara-35266 · **Language:** English
**Tags:** Assam, Adani Power, Himanta Biswa Sarma, Thermal Power Plant, Dhubri, Energy, Jobs

Marking a massive expansion in the northeastern region's power generation infrastructure, Assam Chief Minister Himanta Biswa Sarma performed the foundation laying ceremony for a premier power facility located at Chapar in Dhubri district. The ambitious ultra-supercritical thermal installation, undertaken by Adani Power Limited, will feature an extensive overall generation capacity of 3,200 MW. Mobilising nearly Rs 48,000 crore in capital expenditure, this development represents one of the single heaviest industrial financial commitments ever witnessed across the state.

 The generating station is structured around four high-efficiency generation units possessing an individual capacity of 800 MW each. During the peak development and engineering phase, the site expects to deploy an estimated workforce of up to 20,000 individuals. Once commercial generation formally commences, around 5,000 long-term positions will remain engaged in ongoing operational tasks. Project schedules outline that commercial power commissioning will proceed in progressive stages beginning in December 2030.

 

## Economic Momentum and Local Employment

Addressing the ceremonial gathering, the Chief Minister underscored that the power venture will stimulate regional commerce and substantially boost state revenues through enhanced State Goods and Services Tax collections. The project is anticipated to integrate local commercial suppliers and peripheral industries directly into the newly developing industrial hub.

 Chief Minister Himanta Biswa Sarma stated that the Chapar development reflects the enduring business confidence established through the Advantage Assam Investor Summit 2.0 as the region consolidates its position as a powerhouse. He noted that beyond direct payrolls, domestic enterprises and regional contractors would gain vital entry points to supply specialized support into the flourishing operational ecosystem.

 

## Expanding Industrial Footprint Across Assam

Joining the milestone event, Adani Group Director Jeet Adani reaffirmed the conglomerate's commitment to advancing the industrial progress of the territory. Jeet Adani remarked, “Today marks the beginning of an important new chapter for Assam.” Highlighting the state's geographic characteristics, he observed that regional terrain features could practically transform the territory into an energy reservoir for the entire country, driving forward national economic progress.

 The Chapar complex forms an anchor component within the conglomerate's broader blueprint to inject Rs 63,000 crore directly into the state's power infrastructure. Parallel initiatives include two clean-energy pumped hydro storage installations contributing an aggregate capacity of 2,700 MW managed under Adani Green Energy Limited. Simultaneously, Adani Energy Solutions Limited continues rolling out advanced smart electric metering networks across the state's consumer distribution channels.

 

## Procurement History and Vendor Prospects

The contractual framework for the plant concluded during late 2025. Adani Power Limited emerged as the selected development bidder in October 2025, followed by the formal issuance of the Letter of Award from the Assam Power Distribution Company Limited in November 2025.

 Over the coming three to four years, the conglomerate intends to channel more than Rs 80,000 crore across varied business sectors inside Assam. The execution of the Dhubri thermal facility offers broad commercial prospects for neighborhood logistics operators, material suppliers, engineering vendors, and transport agencies, enabling regional commercial players to scale their businesses within an expanding corporate supplier network.

## What this means for you
The establishment of the 3,200 MW thermal power plant in Dhubri is set to eliminate power deficits while generating thousands of engineering and construction jobs.

- **Across India:** The capacity addition enhances the national grid's regional baseload security and reinforces energy transmission across the northeastern corridor. It provides dependable thermal backup to balance seasonal power fluctuations nationwide.
- **In Assam:** The plant will create up to 20,000 construction jobs and 5,000 permanent operational roles for local professionals and workers. Beginning phased operations in December 2030, homes and industries will benefit from dependable and affordable power access.
- **For Local Businesses:** Regional logistics providers, construction contractors, material vendors, and service agencies will gain direct commercial access to a major corporate procurement ecosystem. This will significantly increase local business revenues and foster peripheral entrepreneurship.
- **For State Revenues:** Substantial capital expenditure and goods consumption will generate sizable SGST receipts for the Assam state government. These tax inflows will provide supplementary funding for regional public infrastructure and welfare development.

## Why this happened
The project stems from Assam's strategic plan to position itself as a regional power hub while securing private capital for energy infrastructure.

- **Investment Summit Outcomes:** The framework gained momentum during the Advantage Assam Investor Summit 2.0, where the state sought massive industrial commitments to satisfy long-term baseload electricity demand. This engagement generated the business trust required for large-scale power investments.
- **Competitive Power Bidding:** Assam Power Distribution Company Limited conducted a competitive bidding process to source bulk electricity. Adani Power Limited secured the project as the winning bidder in October 2025 and formally obtained the Letter of Award in November 2025.
- **Growing Baselload Needs:** Rapid commercialization across the northeastern states necessitated a major modern power hub capable of delivering continuous high-volume electricity. Adopting ultra-supercritical technology fulfills this demand with greater operational fuel efficiency.

## Questions & Answers

### 1. Where is the new thermal power plant being built in Assam?
The 3,200 MW ultra-supercritical thermal power station is being developed at Chapar located in Dhubri district.

### 2. What is the total estimated investment for this project?
Adani Power Limited is investing approximately Rs 48,000 crore to construct the generation facility.

### 3. When is the power plant scheduled to begin commercial operations?
The facility, comprising four 800 MW units, is slated for progressive commissioning starting from December 2030.

### 4. How many jobs will the project generate?
The plant is projected to create up to 20,000 jobs during construction and roughly 5,000 permanent jobs during operation.

### 5. When was the Letter of Award granted to Adani Power?
Adani Power emerged as the winning bidder in October 2025 and received the official Letter of Award in November 2025 from APDCL.

### 6. What is the total planned investment of the Adani Group in Assam?
The group has committed Rs 63,000 crore to the power sector and over Rs 80,000 crore across multiple sectors over three to four years.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._