# Assam Congress Leader Debabrata Saikia Petitions President Murmu Over Proposed 11,000 MW Siang Project

> Congress leader Debabrata Saikia has submitted a six-page representation to President Droupadi Murmu, demanding a comprehensive downstream impact study on Assam for Arunachal Pradesh's proposed 11,000 MW Upper Siang Multipurpose Project.

**Type:** article · **Category:** Assam · **Published:** 2026-10-01 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/assam/arunachal-pradesh-ki-11000-mw-siang-project-para-assam-congress-leader-debabrata-saikia-ne-president-droupadi-murmu-se-lagai-guhar-41026 · **Language:** English
**Tags:** Siang Project, Debabrata Saikia, Droupadi Murmu, Assam, Arunachal Pradesh, Brahmaputra River, Hydropower

Concerns surrounding the proposed 11,000 MW Siang Upper Multipurpose Project in Arunachal Pradesh have reached the highest constitutional office. Senior Assam Congress leader Debabrata Saikia has submitted a detailed six-page representation to President Droupadi Murmu, seeking presidential intervention to safeguard downstream communities, environmental stability, and public safety across Assam before any construction moves forward.

## Ecological Fragility and Downstream Stakes in the Eastern Himalayas
In his communication sent on Wednesday, Debabrata Saikia underscored that the Siang River traverses Arunachal Pradesh before entering Assam, where it forms an integral artery of the wider Brahmaputra river system. Given this downstream geography, Saikia argued that regulating or storing such an immense volume of water in the ecologically fragile Eastern Himalayas cannot be treated as a localized venture confined within Arunachal Pradesh's boundaries. Any substantial hydraulic intervention, he stressed, directly influences the life, livelihoods, and ecological security of millions living downstream in Assam.

## Storage Capacity and Crucial Impact Assessments
Referencing government records, Saikia pointed out that the initiative, also known as the Upper Siang Multipurpose Storage Project, was previously recorded as being at the pre-feasibility stage. The proposed design features a live storage capacity of approximately 9.2 billion cubic metres, with flood moderation listed as one of its primary objectives. Saikia asserted that engineering assumptions must be subjected to an independent, Assam-specific downstream assessment examining alterations to flood peaks, sediment deposition patterns, riverbank erosion, river morphology, wetlands, fisheries, agricultural output, and navigational safety.

## Disaster Modelling and Dam-Safety Protocols
Highlighting the severe seismic vulnerability of the region, the Congress leader urged authorities to conduct comprehensive dam-break inundation modelling. He stated that disaster projections must rigorously evaluate worst-case scenarios, such as torrential cloudbursts, intense landslides, high-magnitude earthquakes, cascading structural failures, and uncontrolled emergency discharges from the massive reservoir. According to Saikia, the discourse should transcend a basic debate over hydropower adoption; the core issue remains whether a megaproject of this scale can proceed without transparent scientific assessment, downstream consultation, and verified safeguards for Assam.

## Calls for Transparency and Multidisciplinary Oversight
The representation urged President Murmu to examine whether the Assam state government has formally provided any concurrence, consent, no-objection certificate, or related correspondence regarding the Siang dam. Saikia called for the public disclosure of all documentation alongside a cumulative assessment of every major river project planned across the Siang-Brahmaputra basin. To protect downstream settlements, he recommended real-time transmission of rainfall, reservoir, inflow, and outflow figures to Assam, backed by automated early warning infrastructure. Furthermore, he sought the immediate creation of an independent multidisciplinary safety panel comprising hydrologists, geologists, seismologists, dam engineers, and ecologists to scrutinize the project's long-term implications.

## What this means for you
The proposed Siang Upper project directly influences the river ecology and riparian communities across Northeast India.

- **Across India:** The development shapes national discourse on mega-hydro projects in fragile Himalayan belts alongside inter-state water sharing protocols. It prompts regulatory scrutiny regarding how downstream environmental risks must be legally addressed before mega-dams receive approval.
- **In Assam:** Millions of riverside residents, farmers, and fishermen dependent on the Brahmaputra face potential shifts in seasonal flooding, siltation, and river morphology. Implementing independent assessments and automated warning systems would determine how vulnerable communities are shielded from unexpected water releases or catastrophic failures.

## Why this happened
The petition to the President stems from deep-seated downstream anxieties regarding the ecological fragility of the Eastern Himalayas and the lack of comprehensive consultation with Assam.

- **Hydrological Continuity:** The Siang River constitutes the primary flow of the Brahmaputra upon entering Assam, meaning any upstream regulation directly alters downstream river dynamics. Regulating a massive 9.2 billion cubic metre live storage reservoir inside a seismically volatile belt creates acute disaster concerns.
- **Questions Over Downstream Clearance:** The project remains at the pre-feasibility stage, yet questions linger regarding whether the Assam government issued formal consent or no-objection certificates. Local leaders fear downstream populations are being excluded from scientific evaluations and planning processes.
- **Need for Independent Safety Audits:** Past experiences with unpredictable river surges and bank erosion prompted demands for multidisciplinary scrutiny covering earthquakes, dam-break risks, and sediment flow before works proceed.

## Questions & Answers

### 1. What did Debabrata Saikia request from President Droupadi Murmu?
He sought presidential intervention for an independent, Assam-specific downstream assessment regarding the environmental and safety impacts of the proposed 11,000 MW Upper Siang project.

### 2. What are the proposed capacity and storage metrics of the Siang project?
The project is designed for an 11,000 MW capacity with a proposed live storage volume of approximately 9.2 billion cubic metres.

### 3. Why is the Siang River critical for the state of Assam?
The Siang River flows from Arunachal Pradesh into Assam, where it forms the primary component of the vital Brahmaputra river network.

### 4. What safety measures were recommended in the representation?
Saikia urged dam-break inundation modelling, real-time hydrological data sharing with Assam, automated warning systems, and the formation of an independent multidisciplinary expert panel.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._