# Delhi Development Authority Unveils MPD-2047 Land Pooling Blueprint With 600 Km Road Network and Mixed-Use Hubs

> Master Plan Delhi-2047 readies a major overhaul of Outer Delhi's urban fringe, introducing 600 km of new roads, integrated civic amenities, and sector-wise land pooling across 105 villages.

**Type:** article · **Category:** Delhi · **Published:** 2026-08-22 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/delhi/delhi-development-authority-ne-mastara-plana-2047-ke-tahata-600-kimi-saraka-netavarka-aura-lainda-pulinga-yojana-ka-khaka-taiyara--20221 · **Language:** English
**Tags:** Delhi Master Plan 2047, Delhi Development Authority, Land Pooling Policy, Urban Extension Road II, Delhi Infrastructure, MPD 2047

The Delhi Development Authority has structured an extensive infrastructure roadmap under Master Plan Delhi-2047 to curb unplanned urban growth across the national capital's peripheral zones. Spanning nearly 200 square kilometers within the designated Urban Extension Areas, the framework focuses on systematic, infrastructure-led transformation. At the core of this expansion is a 600-kilometer new road network designed to offer seamless mobility. Under the guidelines of Master Plan Delhi-2047, all primary arteries measuring 30 meters or more in width inside land pooling zones will be formally notified and constructed directly by the planning agency, guaranteeing that transit networks and basic utilities precede residential occupation.

## Comprehensive Civic Facilities and Town Planning Framework
Departing from traditional housing-centric expansion, the revamped land pooling framework mandates allocation for educational institutions, healthcare complexes, public parks, dedicated green belts, and commercial establishments. This self-contained layout ensures future residents can access everyday essential services locally without overloading the existing infrastructure of central Delhi. Landowners are provided multiple participation avenues, enabling them to voluntarily pool properties and collaborate via developer consortiums. Additionally, alternative mechanisms like Town Planning Schemes have been embedded into the policy, allowing contiguous plot consolidation across a minimum threshold of 20 hectares for coordinated development.

## Mixed-Use Commercial Corridors Along Urban Extension Road-II
To foster economic activity alongside suburban housing, high-density mixed-use zones are planned along Urban Extension Road-II. This belt will integrate affordable housing projects with commercial offices, institutional spaces, logistics hubs, and warehousing zones, thereby expanding employment opportunities and driving regional investment. The inclusion of flexible zoning regulations based on the Right of Way width of adjacent roads will allow tailored land use, giving rise to self-reliant neighborhoods where residence, enterprise, and daily amenities coexist closely.

## Coverage Across Planning Zones and Land Aggregation Progress
The jurisdiction of the land pooling scheme extends across six main planning zones: K-I, L, N, P-II, portions of P-I, and J. In total, the project encompasses 105 revenue villages divided into 138 sectors. Progress updates through July 2026 indicate that over 7,615 applications have been registered, successfully pooling more than 7,885 hectares of land. Crucially, 16 individual sectors have met the statutory requirement of aggregating 70 percent contiguous pooled land, prompting the issuance of provisional notices for consortium creation.

## Sector 8B Milestone and Statutory Amendments
Sector 8B in Planning Zone P-II, covering the village areas of Garhi Khasro and Ibrahimpur, has emerged as the pioneer sector to cross the 70 percent contiguous land threshold, making it the first area eligible for actual construction activity. Meanwhile, landholders across 8 additional sectors have formally informed the development body regarding consortium formation. To streamline land pooling implementation and remove legal bottlenecks, necessary legislative amendments to the Delhi Development Act, 1957 are being initiated. This policy revision aims to balance housing needs, economic growth, public transit, and environmental sustainability across Outer Delhi.

## What this means for you
This news directly affects real estate, urban planning, and residents in the following ways:

- **Across India:** Serves as a landmark benchmark for land assembly and sustainable urban expansion models for growing metropolitan regions.
- **In Delhi-NCR:** Landowners and prospective homeowners across Outer Delhi's 105 villages gain access to planned infrastructure, 600 km of wider roads, and self-contained sectors with built-in civic amenities.

## Questions & Answers

### 1. How long is the proposed road network under Master Plan Delhi-2047?
The plan proposes building a 600-kilometer road network across urban extension areas to ensure seamless connectivity and transport infrastructure.

### 2. Which sector became the first to qualify for development under the land pooling policy?
Sector 8B in Planning Zone P-II, comprising Garhi Khasro and Ibrahimpur villages, was the first to cross the required 70 percent contiguous land threshold.

### 3. What is the minimum area required for a Town Planning Scheme under MPD-2047?
The minimum land area required for implementing a consolidated Town Planning Scheme is set at 20 hectares.

### 4. What developments are planned along Urban Extension Road-II (UER-II)?
High-density mixed-use developments including affordable housing, commercial establishments, institutional centers, and logistics hubs are planned along UER-II.

### 5. Which act is being amended to speed up the implementation of MPD-2047?
Necessary legislative amendments are being initiated for the Delhi Development Act, 1957 to fast-track land pooling execution.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._