# Rajasthan and Haryana Seal Historic Yamuna Water Deal After Three Decades, Rs 34,102 Crore Pipeline to Span 295.5 km

> A landmark Yamuna water-sharing agreement between Rajasthan and Haryana was signed in New Delhi on Monday, ending nearly three decades of delays. The Rs 34,102 crore project will lay a 295.5 km underground pipeline from the Hathnikund Barrage to the Hansiyawas Reservoir in Churu district.

**Type:** article · **Category:** Haryana · **Published:** 2026-06-29 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/haryana/tina-dashaka-ka-intajara-khatma-yamuna-jala-pariyojana-para-haryana-aura-rajasthan-men-hua-aitihasika-samajhauta-3613 · **Language:** English
**Tags:** Yamuna Water Agreement, Haryana Rajasthan, Hathnikund Barrage, Underground Pipeline, Amit Shah, Bhajan Lal Sharma, Churu District, Water Project

A water-sharing deal that had been stuck in limbo for nearly three decades finally moved toward reality on Monday, when Rajasthan and Haryana signed a landmark agreement in New Delhi to share Yamuna river water. The project, long delayed in negotiations, has now entered a decisive phase of implementation, backed by an estimated outlay of Rs 34,102 crore and poised to become a turning point in Rajasthan's water history.

## Senior Leaders Present at the Signing
The signing ceremony brought together key figures from both states and the Union government. Union Home and Cooperation Minister Amit Shah and Union Jal Shakti Minister CR Patil represented the Centre. Rajasthan Chief Minister Bhajan Lal Sharma and Haryana Chief Minister Nayab Singh Saini were also present at the occasion. Senior officials from both state administrations as well as the central government attended the event.

## From Hathnikund Barrage to Churu: A 295.5 km Underground Pipeline
Under the agreement, Rajasthan will receive its allocated share of 577 MCM of Yamuna water. This water will be transported from the Hathnikund Barrage in Haryana through a 295.5 kilometre-long underground pipeline system, eventually reaching the Hansiyawas Reservoir in Churu district of Rajasthan. The total estimated cost of this infrastructure is Rs 34,102 crore.

## What Gets Built Under This Project
The project involves laying three underground pipelines, each with a diameter of 3.6 metres. Supporting infrastructure will include an inspection road, an artificial reservoir, and a modern water management system. Notably, provisions have also been made to supply drinking water at ten locations within Haryana, ensuring that both states draw concrete, direct benefits from this shared undertaking.

## Another Step in Securing Water for Rajasthan
The Yamuna water project takes its place alongside the Ram Jal Setu Link Project and the Jal Jeevan Mission as part of a broader push to secure water access for eastern Rajasthan. Earlier, representatives from Haryana and Rajasthan had also convened in Delhi to discuss the Kishau Dam project, reflecting a sustained pattern of inter-state cooperation on water resource management between the two neighbours.

## What this means for you
- **In Rajasthan:** Residents of Churu and nearby districts are set to gain access to 577 MCM of Yamuna water, offering significant relief to communities facing chronic drinking water shortages.
- **In Haryana:** The project includes provisions to supply drinking water at ten locations within Haryana, meaning local residents there will also see direct, tangible benefits from this deal.

## Questions & Answers

### 1. Where and when was the Yamuna water agreement signed?
The agreement was signed on Monday in New Delhi, between the states of Rajasthan and Haryana.

### 2. What is the total estimated cost of this project?
The estimated cost of the Yamuna water project is Rs 34,102 crore.

### 3. Where will the pipeline run from and to?
The pipeline will run from the Hathnikund Barrage in Haryana to the Hansiyawas Reservoir in Churu district of Rajasthan, covering 295.5 kilometres.

### 4. How much water will Rajasthan receive from this project?
Rajasthan will receive its allocated share of 577 MCM of Yamuna water.

### 5. Which leaders were present at the signing ceremony?
Union Home Minister Amit Shah, Union Jal Shakti Minister CR Patil, Rajasthan Chief Minister Bhajan Lal Sharma, and Haryana Chief Minister Nayab Singh Saini were all present.

### 6. What does Haryana gain from this deal?
The project includes provisions to supply drinking water at ten locations within Haryana, giving the state direct benefits alongside Rajasthan.

### 7. How long had this project been pending?
The project had been pending for nearly three decades.

### 8. What are the technical specifications of the pipeline infrastructure?
Three underground pipelines, each 3.6 metres in diameter, will be laid, along with an inspection road, an artificial reservoir, and a modern water management system.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._