Adra division rail block cancels multiple trains from Sept 14, check full schedule before travel Multiple MEMU and express trains will remain cancelled or short-terminated due to development works in the Adra division of South Eastern Railway from September 14 to 20, 2026. Development works are scheduled to be undertaken in the Adra division of South Eastern Railway from September 14 to September 20, 2026, which will directly impact the operation of several MEMU and express trains running through various stations in Jharkhand. The engineering, TRD, and S&T departments will jointly execute rolling block operations during this period to upgrade railway infrastructure. Consequently, the administration has decided to completely cancel certain train services, while several other trains will be short-terminated or short-originated midway to facilitate the smooth completion of maintenance works. Completely Cancelled Train Services Several regular daily and weekly services will remain suspended on specific dates due to the infrastructure upgrade. The Asansol–Adra–Asansol MEMU (68046/68045) will stay completely cancelled on September 14, September 17, and September 20, 2026. Similarly, the Adra–Bhaga–Adra MEMU (68077/68078) will not operate on September 15 and September 20, 2026. Furthermore, the Asansol–Purulia–Asansol MEMU (63594/63593) has been cancelled for September 14, September 17, September 19, and September 20, 2026, causing significant inconvenience to regular commuters. Partially Terminated and Short-Originated Trains In addition to complete cancellations, the route and destination of several other trains have been restricted midway. The Tatanagar–Asansol–Burnpur MEMU (68056/68060) on September 20, 2026, will run only up to Adra and will begin its return journey from there, remaining suspended between Adra and Asansol. The Kharagpur–Hatia–Kharagpur Express (18035/18036) will terminate its journey at Adra on September 14 and September 17, 2026, halting operations between Adra and Hatia. Additionally, the Asansol–Purulia–Asansol MEMU (63594/63593) on September 15 and September 16, 2026, will only travel up to Adra, keeping the service between Adra and Purulia suspended. Important Advisories for Passengers The railway administration has expressed regret for the inconvenience caused to travelers due to these essential operational works. To keep commuters well-informed, continuous announcements will be made via public address systems at major railway stations. Railway authorities have strongly advised all passengers to cross-check their train schedules and running status before leaving their homes to avoid any last-minute hassle at the station. What this means for you This disruption in train services will directly affect thousands of daily commuters and regular passengers traveling across routes in Jharkhand and West Bengal. • Across India: The railway administration will make continuous public address announcements at major stations to guide affected passengers during the block period. • In Adra Division: Passengers whose trains are cancelled or short-terminated must check updated schedules or arrange alternative transport before starting their journeys. Why this happened This rolling block has been implemented to upgrade and maintain the infrastructure, tracks, and signaling equipment for enhanced safety. • Engineering Works: The engineering, TRD, and S&T departments need to jointly execute essential maintenance on tracks and overhead wire systems. • Safety Standards: Such comprehensive technical blocks are periodically mandatory to ensure completely safe and reliable train operations in the future. Questions & Answers 1. During which dates will the rail block remain in effect? The rolling block in the Adra division of South Eastern Railway will remain in effect from September 14 to September 20, 2026. 2. Which railway departments are executing this work? The engineering, TRD, and S&T departments will jointly execute the rolling block maintenance work. 3. On which dates is the Asansol–Adra–Asansol MEMU cancelled? This train will remain completely cancelled on September 14, September 17, and September 20, 2026. 4. When will the Adra–Bhaga–Adra MEMU stay suspended? This MEMU train will not operate on September 15 and September 20, 2026. 5. Where will the Tatanagar–Asansol–Burnpur MEMU run on Sept 20? On September 20, 2026, this train will run only up to Adra and will originate its return journey from there. 6. How is the Kharagpur–Hatia Express affected? This train will terminate at Adra on September 14 and September 17, 2026, skipping the Adra to Hatia leg. 7. What arrangement has the railway made for passengers? Continuous announcements will be made via public address systems at major stations, and passengers are advised to check schedules. https://trendkia.com/en/jharkhand/adra-division-rail-block-cancels-multiple-trains-from-sept-14-check-full-schedule-before-travel-32049 TrendKia — Har trend, sabse pehle.