# Chakradharpur Railway Division Cancels 18 Trains and Diverts Two for Infrastructure Works

> Track connectivity and yard remodeling work between Bagdehi and Jharsuguda in Chakradharpur division have led to the cancellation of 18 express trains and route changes for Utkal Express.

**Type:** article · **Category:** Jharkhand · **Published:** 2026-10-31 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/jharkhand/chakradharpur-mndala-men-takaniki-karya-ke-chalate-18-trenen-radda-aura-do-ka-marga-parivartita-53839 · **Language:** English
**Tags:** Chakradharpur Railway Division, Train Cancellations, Jharsuguda Railway Station, Utkal Express, Indian Railways, Tatanagar

Travel schedules across Jharkhand, Odisha, and adjoining states face widespread adjustments as the Chakradharpur railway division undertakes major infrastructure work. Engineering teams are linking the newly laid fourth railway line to the main operational track between Bagdehi and Jharsuguda railway stations. The scheduled work involves comprehensive pre-non-interlocking, non-interlocking, and yard remodeling procedures across multiple phases. To safely facilitate these critical signaling and structural upgrades, railway authorities have cancelled 18 express and passenger services across varying dates and altered the path of two long-distance trains.

## Connecting the Fourth Rail Line Between Bagdehi and Jharsuguda
The operational adjustments stem from infrastructure modernization planned between Bagdehi and Jharsuguda stations within the Chakradharpur division. Technical execution is scheduled in distinct stages between November 1 and November 3. Reconfiguring track lines and integrating updated signaling apparatus require track occupations that prevent normal train movements on this busy corridor. The comprehensive upgrade aims to improve route capacity and ease operational congestion along the busy trunk route once the fourth rail track becomes fully integrated with the main yard line.

## Schedule of Cancelled Express and Passenger Services
Railway notifications outline the cancellation of specific train services across various dates as follows

- **18109/18110 Itwari-Tatanagar-Itwari Express:** Cancelled in both directions from November 1 to November 3.
- **68029/68030 Rourkela-Jharsuguda-Rourkela MEMU:** Cancelled in both directions from November 1 to November 3.
- **18125/18126 Rourkela-Puri-Rourkela Express:** Cancelled in both directions on November 3.
- **18175 Hatia-Jharsuguda Express:** Cancelled from November 1 to November 3.
- **18176 Jharsuguda-Hatia Express:** Cancelled from November 2 to November 4.
- **22861 Howrah-Kantabanji Ispat Express:** Cancelled on November 3.
- **22862 Kantabanji-Howrah Ispat Express:** Cancelled on November 4.
- **18107 Rourkela-Jagdalpur Express:** Cancelled on November 3.
- **18108 Jagdalpur-Rourkela Express:** Cancelled on November 4.
- **13425 Malda Town-Surat Express:** Cancelled on October 31.
- **13426 Surat-Malda Town Express:** Cancelled on November 2.
- **17433 Tirupati-Raxaul Express:** Cancelled on November 2.
- **17434 Raxaul-Tirupati Express:** Cancelled on November 5.
- **22839/22840 Bhubaneswar-Rourkela-Bhubaneswar Express:** Cancelled in both directions on November 3.

## Route Diversions for Utkal Express
Alongside the full cancellations, railway authorities have diverted two major services. Train number 18477 Puri-Yog Nagari Rishikesh Utkal Express departing from Puri on November 2 will skip its conventional route via Cuttack-Bhadrak-Hijli-Tatanagar-Rourkela-Jharsuguda-Ib. Instead, it will run along a diverted alignment covering Cuttack-Sambalpur City-Jharsuguda Road-Ib. Conversely, train number 18478 Yog Nagari Rishikesh-Puri Utkal Express leaving Yog Nagari Rishikesh on November 2 will bypass its regular path of Ib-Jharsuguda-Rourkela-Tatanagar-Hijli-Bhadrak-Cuttack, proceeding instead via Ib-Jharsuguda Road-Sambalpur City-Cuttack, bypassing key intermediate industrial hubs.

## What this means for you
Thousands of passengers traversing the Chakradharpur division will need to urgently rearrange travel itineraries due to these structural cancellations and diversions.

- **Across India:** Long-distance travellers on routes connecting Surat, Malda Town, Tirupati, and Raxaul face service cancellations that disrupt cross-country journeys. Impacted passengers can claim full ticket refunds under standard railway rules or reserve seats on alternative rail corridors.
- **In Jharkhand:** Commuters and regional travelers across Tatanagar, Hatia, and Chakradharpur will experience acute travel disruption between November 1 and November 4. Cancellations of the Ispat Express, local MEMU shuttles, and the diversion of the Utkal Express mean passengers must rely on road transport or alternate regional trains.

## Why this happened
Railway authorities scheduled this service block to integrate major infrastructure additions and enhance track capacity between Bagdehi and Jharsuguda stations.

- **Direct Cause:** The primary trigger is connecting the newly laid fourth railway line directly into the operational main line and signaling grid.
- **Technical Work Involved:** Commissioning this infrastructure requires comprehensive pre-non-interlocking, non-interlocking, and yard remodeling procedures across the station yards.
- **Next Steps:** Following the completion of the multi-phase technical works, the fourth track line will open for regular operations, lowering congestion across the busy freight and passenger route.

## Questions & Answers

### 1. Why have trains been cancelled in the Chakradharpur division?
Services are cancelled to enable track connectivity for a fourth rail line between Bagdehi and Jharsuguda, along with associated yard remodeling works.

### 2. Which primary dates are affected by these rail disruptions?
Most cancellations run between November 1 and November 3, with specific services also cancelled on October 31, November 4, and November 5.

### 3. How many trains are cancelled in total due to the maintenance work?
A total of 18 express and passenger trains have been cancelled across the operational window.

### 4. What route diversion has been implemented for the Utkal Express?
On November 2, Utkal Express services departing both Puri and Yog Nagari Rishikesh will bypass Tatanagar and Rourkela, traveling via Sambalpur City and Jharsuguda Road instead.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._