Demolition of Dilapidated Bhendi Bazaar Building Begins Today in Mumbai Amid Heavy Security The BMC is executing a demolition drive on the dilapidated Haji Ismail Habib Musafirkhana building in Mumbai's Bhendi Bazaar on November 18 and 19. While locals have raised concerns citing a Waqf Tribunal stay and a short notice period, authorities maintain that the structure poses a severe safety hazard. Mumbai: The local municipal administration in Mumbai is moving forward with a high-profile demolition drive targeting a precarious and aged traveler's lodge situated in the bustling Bhendi Bazaar neighborhood. The extensive clearance operation is scheduled to take place across November 18 and 19, backed by a heavy deployment of police personnel to maintain public order and prevent any disruptions. The C ward office of the civic body had officially issued a formal notice regarding the impending action on November 16, following directions originally laid down by the Bombay High Court. Details of the Haji Ismail Habib Musafirkhana Demolition The structure marked for removal is the Haji Ismail Habib Musafirkhana, located strategically at the intersection of Pakmodia Street and Second Cooper Street. Following rigorous structural audits, municipal engineers categorized the building under the C-1 danger bracket, designating it as extremely ruinous and unsafe for habitation. Authorities pointed out that the legal groundwork for clearing and pulling down the premises stems from a Bombay High Court ruling delivered on August 31, 2020. Recent inspections conducted by the civic body revealed that while the upper floors are largely vacant, the ground level continues to host an active prayer hall. Local Opposition and Concerns Over Waqf Tribunal Stay In contrast to the official stance, local residents and representatives supporting the trust have strongly contested the timing and legitimacy of the bulldozer action. Objectors claimed that the Waqf Tribunal had previously ordered a stay on demolition activities at the site. Furthermore, critics argued that the civic administration provided a severely truncated notice period of just 24 hours, whereas standard protocols typically mandate a minimum 15-day window to allow affected parties sufficient time to seek legal recourse in court. Road Widening Plans and Alternative Arrangements Addressing the broader scope of the project, municipal officials explained that the deteriorating structure also falls squarely in the path of a proposed road-widening initiative along Second Cooper Street, directly obstructing the updated street alignment. To mitigate religious concerns, the Saifei Burhani Upliftment Trust arranged alternative provisions for those utilizing the prayer space, offering temporary accommodation at units F67, F68, and S68 within An Nasr Tower in Sector 4, alongside an alternative option of financial compensation to lease a suitable alternate location independently. Civic teams have instructed occupants to respectfully and safely relocate copies of the Quran Shareef and other sacred artifacts prior to the heavy machinery clearing the remaining sections of the property. The central question remains whether the municipal corporation can successfully complete the two-day clearance drive in the face of local resistance and claims surrounding tribunal directives. Meanwhile, similar urban safety crackdowns continue to make headlines across the metropolitan region. What this means for you This municipal action carries direct implications for urban residents living in aging or structurally compromised buildings across major metropolitan centers. • Across India: Urban local bodies nationwide are adopting a stricter stance toward dilapidated structures to prevent accidental collapses during monsoon or routine periods. Such enforcement campaigns highlight that properties officially classified as dangerous must be vacated promptly without delays. • In Mumbai: Residents in Bhendi Bazaar and comparable dense neighborhoods are reminded that civic development projects, including road widening alignments, will be enforced rigorously by authorities. Occupants must remain vigilant regarding short notice periods and prepare to secure their belongings or seek designated alternative arrangements ahead of time. Why this happened The demolition drive is being carried out as a direct result of structural safety concerns and preceding legal directives. • Structural Hazard: The municipal corporation classified the lodge building under the C-1 danger category, making its immediate removal necessary to prevent public safety accidents. • Court Mandate: The Bombay High Court issued a specific order regarding this disputed property on August 31, 2020, setting the legal foundation for the eviction and clearance process. • Road Expansion: A portion of the aging structure falls directly within the proposed street alignment for Second Cooper Street, necessitating clearance to facilitate ongoing urban widening plans. Questions & Answers 1. In which area of Mumbai is the building demolition taking place? The demolition is taking place at the Haji Ismail Habib Musafirkhana building located in Mumbai's Bhendi Bazaar area. 2. On which dates is this action being executed? The demolition drive is being executed on November 18 and 19. 3. What is the primary reason for pulling down this building? The BMC classified the structure as a C-1 category dangerous building that posed a severe safety risk to the public. 4. Under whose directives is this action being carried out? The action is being carried out pursuant to an order passed by the Bombay High Court on August 31, 2020. 5. What objections have local residents raised against the drive? Locals claimed that the Waqf Tribunal ordered a stay on the demolition and argued that authorities provided only a 24-hour notice period. https://trendkia.com/en/maharashtra/munbai-ke-bhendi-bazaar-men-jarjara-imarata-para-buladojara-karravai-aja-se-pulisa-bala-tainata-60898 TrendKia — Har trend, sabse pehle.