{
  "type": "article",
  "title": "Azamgarh Begins Rs 1.80 Crore Eklavya Ghat Overhaul With Two Parks Under AMRUT Scheme",
  "summary": "Azamgarh civic authorities have initiated redevelopment works at Eklavya Ghat in Maria, building north and south parks worth Rs 1.80 crore under the AMRUT 1.0 project.",
  "content": "Civic infrastructure and waterfront spaces in Uttar Pradesh's Azamgarh are undergoing a structured transformation as the local municipal council launches a comprehensive overhaul of Eklavya Ghat in Maria. The initiative focuses on enhancing civic amenities, restoring riverfront surroundings, and establishing open green spaces where local residents, families, and children can safely stroll and spend leisure time together. Groundwork has officially commenced across the site to convert the neglected riverbank into an organized civic destination.\n\nProject Allocation and Dual Park Development Under AMRUT 1.0\nDetailing the scope and execution of the revamp, Executive Officer of the Municipal Council Dr. Brijesh Kumar stated that development activities are being actively mobilized to organize and upgrade the riverfront. Administrative sanction for the initiative was secured under the government's AMRUT 1.0 programme. As part of this approved blueprint, authorities are constructing two dedicated recreational zones comprising a northern park and a southern park along the ghat. Approximately Rs 1.80 crore has been designated to fund the development of one of these major recreational facilities.\n\nRecreational Infrastructure, Green Belts, and Safety Lighting\nCivil teams are executing the project on an expedited timetable in accordance with state administrative directives to deliver civic upgrades without prolonged disruption. The waterfront layout includes dynamic water fountains and decorative illumination designed to brighten the entire public space during evening hours. A dedicated playground area is being prepared specifically for children's activities, accompanied by extensive landscaping and tree plantations to expand the green canopy. To ensure pedestrian convenience and hazard-free movement, teams are restructuring the existing embankment stairways, laying down resilient interlocking pavements, and installing high-intensity lighting poles to eliminate dark zones along the riverbank.\n\nPublic Convenience Facilities and Detailed Project Report for Main Ghat\nAddressing essential civic hygiene and public requirements, the project layout incorporates dedicated changing rooms alongside modern sanitation complexes for visitors and bathers. Municipal authorities anticipate completing the park development within the next 5 to 10 days, allowing immediate public opening for walking, recreation, and community exercise. Regarding the broader restructuring of the central riverfront, Dr. Kumar confirmed that engineers are compiling a Detailed Project Report (DPR). Once this technical blueprint receives formal sign-off, subsequent phases of construction across the primary ghat structure will commence immediately.\n\nWhat this means for you\nThe upgrade will provide Azamgarh residents with a clean riverfront environment, organized green parks, and modern civic infrastructure.\n\n• In Azamgarh: Residents of Maria and surrounding neighbourhoods gain safe public parks and pedestrian walking tracks. The facility is expected to open for families and morning walkers within the next 5 to 10 days.\n• For Visitors: Dedicated changing rooms and sanitary facilities will be available for bathers and riverfront visitors. This resolves long-standing issues concerning privacy and hygiene for women and senior citizens at the riverbank.\n• Evening Safety: Repaired stairways, interlocking pavements, and decorative illumination will eliminate slippery pathways and unlit blind spots. Citizens can comfortably walk along the riverfront during evening and nighttime hours.\n• Main Waterfront Area: A Detailed Project Report is in progress to renovate the central ghat sections. This structured expansion will enhance local footfall and potentially support street vendors in surrounding pockets.\n\nWhy this happened\nThe project addresses poor waterfront maintenance and a lack of organized civic recreational spaces in Azamgarh. Civic authorities leveraged urban development funding to restructure the public riverfront.\n\n• AMRUT 1.0 Sanction: Urban regeneration guidelines under the AMRUT 1.0 scheme provide capital for open green spaces and riverfront upgrades. Azamgarh Municipal Council secured administrative approval to invest approximately Rs 1.80 crore into this site.\n• Deficit of Public Green Belts: The Maria area lacked equipped play zones for children and safe walkways for senior citizens. Municipal authorities repurposed underutilized riverfront land into designated northern and southern recreational parks.\n• Deteriorated Riverbank Infrastructure: Broken staircases, inadequate nighttime lighting, and absence of civic utilities previously deterred local visitors. The plan introduces modern toilets, changing chambers, interlocking walkways, and robust illumination.\n• Comprehensive Riverfront Vision: Rather than limiting works to landscaping, authorities are formalizing a Detailed Project Report (DPR). Final clearance of this report will trigger phase-two civil restructuring across the primary ghat.\n\nQuestions & Answers\n\n1. Under which scheme is the redevelopment of Eklavya Ghat in Azamgarh being carried out?\nThe development and beautification works are being executed under the government's AMRUT 1.0 scheme.\n\n2. What is the estimated financial outlay for this park project?\nAccording to municipal authorities, an expenditure of around Rs 1.80 crore has been designated for developing one of the parks.\n\n3. What public amenities are being added at Eklavya Ghat for visitors and children?\nThe site will feature fountains, decorative lighting, a children's play zone, green belts, interlocking tiles, changing rooms, and modern restrooms.\n\n4. When are the parks expected to open for local residents?\nMunicipal officials state that park construction will be completed within 5 to 10 days, after which it will open to the public.\n\n5. What is the update on the renovation of the primary ghat structure?\nA Detailed Project Report (DPR) is currently being finalized, after which construction across the main ghat will be initiated.",
  "url": "https://trendkia.com/en/national/azamgarh-ke-eklavya-ghat-para-1-80-karora-rupaye-se-snvarenge-do-adhunika-parka-nagara-palika-ne-shuru-kiya-nirmana-35745",
  "category": "India",
  "publishedAt": "2026-09-21",
  "tags": [
    "Azamgarh",
    "Eklavya Ghat",
    "Azamgarh Municipal Council",
    "AMRUT Scheme",
    "Uttar Pradesh Development",
    "Ghat Beautification"
  ],
  "language": "en",
  "site": "TrendKia"
}