Firozabad CM Grid project faces massive delays as Rasoolpur road construction remains stalled for six months Road construction under the CM Grid scheme in Firozabad has stalled for six months, causing deep potholes and waterlogging that anger locals and injure commuters. While grand claims are being made about transforming urban areas into smart cities through the CM Grid scheme, the sluggish pace of development projects by the municipal corporation is frustrating residents in Firozabad, Uttar Pradesh. Municipal authorities have dug up roads in various parts of the city for infrastructure work, but months have passed without bringing these projects to completion. This prolonged delay forces commuters to endure severe difficulties on a daily basis, with people frequently falling into uncovered potholes and sustaining injuries. Smart city road construction hangs in limbo for six months Under the CM Grid scheme, the Firozabad Municipal Corporation undertook the task of widening and rebuilding the stretch from Nalband Crossing Shikohabad Adda up to the Rasoolpur police station. Local residents point out that construction on this vital route has been dragging on for the past six months without reaching completion. Municipal contractors spent months working near the edges of the road, yet the project remains unfinished. When residents question the delay, contractors dismiss them curtly, telling them not to worry and claiming the road will eventually be built. Allegations of arbitrariness and mounting woes during monsoon Local resident Mohammad Shabir stated that contractors and officials are executing the project in an arbitrary manner. The road was excavated months ago and left unattended with no tangible progress on development. With the ongoing monsoon season, rainwater accumulates heavily in the potholes, causing unsuspecting commuters to fall in and get hurt. Despite these hazards, no authority addresses public complaints. Construction work is currently halted, and contractors maintain that activity will resume only after the rainy season completely ends. Potholes turn the busy route into a hazard for e-rickshaws and pedestrians Another resident, Faheem, noted that while the road is being widened, it serves as a heavily congested corridor. A major bangle market operates nearby, resulting in continuous movement of vehicles and e-rickshaws. With the roadway heavily excavated and dotted with deep pits, e-rickshaw drivers and passersby frequently get trapped and flip over, suffering injuries. This ruined road has turned into a major hazard for everyday travelers, while municipal officials continue to ignore the escalating crisis. What this means for you The delayed road construction and poor civic conditions in Firozabad directly impact local residents, traders, and daily commuters navigating the area. • Across India: Delays in civic infrastructure projects across urban centers highlight widespread administrative inefficiencies that inconvenience the general public. • In Firozabad: Residents of Rasoolpur and nearby areas must navigate deep potholes, waterlogging, and accident hazards daily, severely disrupting local commerce and transport. Questions & Answers 1. Under which scheme is the road construction taking place in Firozabad? The road is being widened and rebuilt in Firozabad under the CM Grid scheme. 2. Between which locations is the road construction being carried out? The construction work extends from Nalband Crossing Shikohabad Adda up to the Rasoolpur police station. 3. How long has the road construction remained incomplete? According to locals, work on building this road has been ongoing for the past six months without reaching completion. 4. What problems are people facing during the monsoon season? Rainwater fills the excavated potholes, causing commuters and e-rickshaws to slip, flip over, and suffer injuries. 5. What reason do contractors give for halting the construction work? Contractors claim that construction activity will resume only after the rainy season completely ends. https://trendkia.com/en/national/phi-ojabada-men-cm-grid-yojana-ki-susta-raphtara-chhaha-mahine-bada-bhi-rasoolpur-saraka-nirmana-adhara-men-25158 TrendKia — Har trend, sabse pehle.