# Heavy Rains Fill Govindgarh Dam to Capacity as Luni River Overflow Brings Sweet Irrigation Water to 1000 Nagaur Farmers

> Torrential monsoon rains in the Aravali range have triggered the spillway overflow of Ajmer's Govindgarh Dam, reigniting the flow of the Luni River and supplying fresh irrigation water across 780 hectares in Nagaur district.

**Type:** article · **Category:** India · **Published:** 2026-07-30 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/national/ajmer-ki-pahadiyon-me-barish-se-bhara-govindgarh-dam-nagaur-ke-1000-kisanon-ko-milega-luni-ka-meetha-pani-12067 · **Language:** English
**Tags:** Nagaur News, Govindgarh Dam, Luni River, Rajasthan Rain, Irrigation Project, Alniyawas Canal

Torrential monsoon rainfall across the catchments of Ajmer district and the surrounding Aravali hills has pushed the historic Govindgarh Dam to its maximum capacity, causing water to cascade over its spillway. This overflow has revived the flow of the Luni River with newfound momentum after a long gap of several years. The moving water column is now traveling through Alniyawas, Riyan Badi, and Jasnagar before terminating at the Pichiyak pond. Beyond replenishing local riverbeds, this massive influx of freshwater is actively restoring regional hydrological balances, altering agricultural prospects, and renewing depleted groundwater reserves across dozens of farming settlements.

## Govindgarh Dam Capacity and 3 Decade Groundwater Revival
Constructed in 1995 over the Sagarmati River in Ajmer district, the Govindgarh Dam features a total storage capacity of 155 MCFT. Consistent and generous monsoon rain recorded over the past three consecutive years has ensured steady inflow into the reservoir, ultimately leading to the present overflow. The primary outcome of this continuous recharge is visible beneath the surface, where agricultural wells that remained completely dry for nearly three decades are experiencing a substantial rise in water levels. In villages where agriculturalists faced severe water scarcity, tube wells and open wells are now refilling, offering dual relief by easing rural drinking water shortages alongside farm irrigation.

## 8 Km Canal Reconstruction Underway at ₹283 Lakh Budget
The overflow of the Govindgarh Dam brings direct relief to approximately 1000 farming households operating across Nagaur district. Agricultural authorities project that the reservoir water will provide dependable irrigation for nearly 780 hectares of arable land. To convey this sweet water efficiently to farm plots near the Alniyawas region, workers are executing the rapid reconstruction of an 8 kilometer long canal channel. Being built at an estimated project expenditure of 283 lakh rupees, the completed canal network will supply reservoir water directly to Nagaur fields, fortifying local agricultural infrastructure against dry spells.

## Boost for Rabi Crops and Reduction in Cultivation Expenses
Through this revamped canal, around 600 farmers in the Alniyawas region alone will receive sufficient water supplies for the upcoming Rabi cropping season. This guaranteed water availability will simplify the sowing of essential crops such as wheat, mustard, and gram. Furthermore, local agricultural producers note that continuous aquifer recharge coupled with proper canal maintenance will fundamentally reshape farming economics in Nagaur. Higher crop quality combined with an anticipated doubling of harvest yields will significantly reduce input expenditures previously spent on tube well electricity and diesel pumping systems.

## What this means for you
**Across India:** Effective reservoir management and canal restoration boost essential Rabi crop yields like wheat and mustard, supporting national food security and agrarian stability.

**In Nagaur:** Over 1000 farmers gain direct canal irrigation for 780 hectares of farmland, lowering pumping costs and reviving groundwater wells dry for nearly three decades.

## Questions & Answers

### 1. Where is Govindgarh Dam located and when was it built?
Govindgarh Dam is located on the Sagarmati River in Ajmer district and was constructed in the year 1995.

### 2. What is the total water storage capacity of Govindgarh Dam?
The total storage capacity of Govindgarh Dam is 155 MCFT.

### 3. Which route will the overflowing water take to reach Pichiyak pond?
The spillway water flows along the Luni River through Alniyawas, Riyan Badi, and Jasnagar before reaching Pichiyak pond.

### 4. What is the length and budget of the canal reconstruction project?
An 8 kilometer long canal is being reconstructed at a project cost of 283 lakh rupees to convey water to Nagaur fields.

### 5. How many farmers and hectares of land will benefit from this dam water?
Approximately 1000 farmers will benefit directly, with the canal irrigating around 780 hectares of agricultural land.

### 6. Which major crops stand to gain from this increased irrigation supply?
The enhanced water availability will primarily benefit Rabi crops such as wheat, mustard, and gram.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._