{
  "type": "article",
  "title": "India's Longest 87 km Elevated Corridor Approved Between Andhra Pradesh and Telangana, Cuts 6 Hour Journey to 60 Minutes",
  "summary": "The Central Government has granted in-principle approval for an 87 km four-lane elevated corridor connecting Dornala in Andhra Pradesh to Brahmanapalli in Telangana. Estimated at ₹18,000 crore, it reduces travel distance from 270 km to 87 km.",
  "content": "The Central Government has granted in-principle approval for the construction of India's longest 4-lane elevated corridor, connecting the states of Andhra Pradesh and Telangana. Spanning a total distance of 87 kilometers, this ambitious highway project will stretch from Dornala in Andhra Pradesh to Brahmanapalli in Telangana. Officially named the Peddaravedu-Srisailam Corridor, the elevated highway is designed to streamline travel for pilgrims visiting the famous Srisailam Temple while preserving the delicate biodiversity of the Nallamala Forest region.\n\nDrastic Reduction in Travel Time and Commute Distance\nCurrently, commuters traveling between Dornala and Brahmanapalli are forced to take a circuitous 270-kilometer route that threads through dense forest terrain. This journey routinely takes more than 6 hours to complete and poses safety risks due to difficult driving conditions. Once the new Peddaravedu-Srisailam Elevated Corridor is completed, the route length will drop sharply to just 87 kilometers. Drivers will be able to cover the distance in approximately 1 hour, avoiding the need to traverse forest floors and bypassing heavy traffic bottlenecks.\n\nProject Cost Allocation and State Breakup\nThe total estimated cost for constructing this elevated corridor stands at approximately ₹18,000 crore. Out of this total outlay, the Central Government has already accorded in-principle approval for ₹12,000 crore. The proposal for this infrastructure development was initially conceptualized following Prime Minister Narendra Modi's visit to Srisailam. Geographically, about 42 kilometers of the 87 km corridor will be built inside Andhra Pradesh, while the remaining 45 kilometers will fall within Telangana territory.\n\nProtecting Wildlife and Eliminating Night Travel Bans\nThe existing ground road passes directly through the Nallamala Forest, requiring commuters to cross between the Nagarjunasagar-Srisailam Tiger Reserve and the Amrabad Tiger Reserve. To protect wild animals from vehicular noise and headlights, authorities currently enforce a complete night traffic restriction from 9 PM to 6 AM. This rule prevents 24/7 highway connectivity. By elevating the four-lane highway above the tree canopy, vehicles can operate continuously without disturbing the movement or peace of wildlife on the forest floor below.\n\nEngineering Challenges and Enhanced Road Safety\nThe National Highways Authority of India (NHAI) is overseeing the execution of this infrastructure project. Erecting massive structural pillars within a dense forest ecosystem presents the primary engineering hurdle. To prevent unauthorized entry into protected forest zones, NHAI has planned very few access points along the elevated stretch. This design will minimize ground-level vehicular presence and significantly reduce accident risks compared to the current hazardous highway sections. Commuters traveling on the elevated bridge will also enjoy a unique aerial view of tigers, bears, and other wildlife roaming in the reserve below.\n\nBoosting Eco-Tourism and Regional Economic Growth\nThe completion of the corridor is set to deliver a major boost to regional tourism and the local economy. During festive periods, existing routes such as Highway 565 and Highway 765 experience severe gridlock, disrupting travel and disturbing local fauna. According to NHAI, the new elevated structure will ease this congestion, providing smooth access for temple devotees as well as nature enthusiasts eager to explore the forest ecosystem. The resulting surge in visitors is expected to stimulate business activities across both Andhra Pradesh and Telangana.\n\nWhat this means for you\nThe construction of this new elevated corridor will drastically reduce travel time and fuel costs for commuters between Andhra Pradesh and Telangana as well as devotees visiting Srisailam Temple.\n\n• Across India: It sets a precedent for eco-friendly infrastructure that protects wildlife habitats while upgrading national highway networks. Long-distance travelers will benefit from safer and uninterrupted transit options.\n• In Andhra Pradesh and Telangana: Travel time between Dornala and Brahmanapalli will drop from over 6 hours to just 1 hour, cutting distance from 270 km to 87 km. Drivers will no longer face the 9 PM to 6 AM night travel ban through the tiger reserves.\n\nWhy this happened\nThis elevated corridor was planned to resolve severe transit delays and protect wildlife habitats along the existing highway through the Nallamala Forest between Andhra Pradesh and Telangana.\n\n• Excessive distance and travel time: Commuters currently navigate a 270 km circuitous route taking over 6 hours to complete.\n• Night traffic bans: Road closures from 9 PM to 6 AM to safeguard Nagarjunasagar-Srisailam and Amrabad Tiger Reserves prevent round-the-clock transportation.\n• Traffic congestion and safety hazards: Heavy festive traffic on Highway 565 and 765 creates severe bottlenecks and increases accident risks for both commuters and wild animals.\n• Pilgrimage connectivity initiative: Conceptualization began after Prime Minister Narendra Modi's visit to Srisailam highlighted the need for seamless devotee access.\n\nQuestions & Answers\n\n1. Which two states will be connected by India's longest elevated corridor?\nThe 87-kilometer elevated corridor will connect Dornala in Andhra Pradesh with Brahmanapalli in Telangana.\n\n2. How much will travel time be reduced once the corridor is completed?\nTravel distance will drop from 270 km to 87 km, reducing the total journey time from over 6 hours to just 1 hour.\n\n3. What is the estimated cost of the project and how much has been sanctioned by the Centre?\nThe estimated project cost is ₹18,000 crore, with the Central Government granting in-principle approval for ₹12,000 crore.\n\n4. Which tiger reserves does the corridor pass over?\nThe elevated structure will pass over the Nagarjunasagar-Srisailam Tiger Reserve and the Amrabad Tiger Reserve in the Nallamala Forest.\n\n5. How is the corridor length split between Andhra Pradesh and Telangana?\nOut of the 87 km total length, approximately 42 km will be built in Andhra Pradesh and 45 km in Telangana.",
  "url": "https://trendkia.com/en/national/andhra-pradesh-aura-telangana-ke-bicha-banega-desha-ka-sabase-lnba-87-kimi-eliveteda-koridora-ghata-jaegi-6-ghnte-ki-duri-60506",
  "category": "India",
  "publishedAt": "2026-11-16",
  "tags": [
    "Elevated Corridor",
    "Andhra Pradesh",
    "Telangana",
    "Srisailam Temple",
    "NHAI",
    "Tiger Reserve",
    "Nallamala Forest",
    "Road Infrastructure"
  ],
  "language": "en",
  "site": "TrendKia",
  "whatItMeansForYou": "The construction of this new elevated corridor will drastically reduce travel time and fuel costs for commuters between Andhra Pradesh and Telangana as well as devotees visiting Srisailam Temple.\n\n• Across India: It sets a precedent for eco-friendly infrastructure that protects wildlife habitats while upgrading national highway networks. Long-distance travelers will benefit from safer and uninterrupted transit options.\n• In Andhra Pradesh and Telangana: Travel time between Dornala and Brahmanapalli will drop from over 6 hours to just 1 hour, cutting distance from 270 km to 87 km. Drivers will no longer face the 9 PM to 6 AM night travel ban through the tiger reserves.",
  "whyItHappened": "This elevated corridor was planned to resolve severe transit delays and protect wildlife habitats along the existing highway through the Nallamala Forest between Andhra Pradesh and Telangana.\n\n• Excessive distance and travel time: Commuters currently navigate a 270 km circuitous route taking over 6 hours to complete.\n• Night traffic bans: Road closures from 9 PM to 6 AM to safeguard Nagarjunasagar-Srisailam and Amrabad Tiger Reserves prevent round-the-clock transportation.\n• Traffic congestion and safety hazards: Heavy festive traffic on Highway 565 and 765 creates severe bottlenecks and increases accident risks for both commuters and wild animals.\n• Pilgrimage connectivity initiative: Conceptualization began after Prime Minister Narendra Modi's visit to Srisailam highlighted the need for seamless devotee access.",
  "questionsAndAnswers": [
    {
      "question": "Which two states will be connected by India's longest elevated corridor?",
      "answer": "The 87-kilometer elevated corridor will connect Dornala in Andhra Pradesh with Brahmanapalli in Telangana."
    },
    {
      "question": "How much will travel time be reduced once the corridor is completed?",
      "answer": "Travel distance will drop from 270 km to 87 km, reducing the total journey time from over 6 hours to just 1 hour."
    },
    {
      "question": "What is the estimated cost of the project and how much has been sanctioned by the Centre?",
      "answer": "The estimated project cost is ₹18,000 crore, with the Central Government granting in-principle approval for ₹12,000 crore."
    },
    {
      "question": "Which tiger reserves does the corridor pass over?",
      "answer": "The elevated structure will pass over the Nagarjunasagar-Srisailam Tiger Reserve and the Amrabad Tiger Reserve in the Nallamala Forest."
    },
    {
      "question": "How is the corridor length split between Andhra Pradesh and Telangana?",
      "answer": "Out of the 87 km total length, approximately 42 km will be built in Andhra Pradesh and 45 km in Telangana."
    }
  ]
}