Key Express Trains Diverted to Dadar and Thane as CSMT Begins 75 Day Maintenance Block Central Railway has enforced a 75-day traffic and power block at Mumbai CSMT from October 1 to December 15, terminating eight key mail and express trains early at Dadar and Thane. Extensive technical maintenance and infrastructure upgrade work has commenced at Mumbai's iconic Chhatrapati Shivaji Maharaj Terminus, leading to significant timetable adjustments for inbound long-distance traffic. Central Railway implemented a structured traffic and power block on October 1, cordoning off platform number 14, platform number 15, and stabling line 15. The maintenance window is scheduled to run for 75 days, concluding on December 15. Throughout this operational window, several mail and express services running on the Up line will face alterations to their scheduled termination points. Early Termination Protocol at Dadar and Thane To facilitate the ongoing engineering tasks without creating severe track congestion inside the primary terminal area, railway authorities decided that affected services will not run all the way to their final destination at Chhatrapati Shivaji Maharaj Terminus. Instead, the trains will be short-terminated at Dadar and Thane railway stations. Commuters heading towards south Mumbai must alight at these intermediate hubs and make alternate local transit arrangements. Central Railway released an official inventory of eight prominent express routes from eastern, southern, and central parts of India that fall directly under this short-termination plan. Detailed Directory of the Eight Impacted Rail Services The revised operational schedule applies daily between October 1 and December 15 for the following eight designated passenger services • Ballarshah to CSMT Nandigram Express (Train Number 11002): This inbound service will now conclude its passenger journey at Dadar railway station rather than reaching the south Mumbai terminal. • Howrah to CSMT Express (Train Number 12810): Connecting West Bengal with Mumbai, this cross-country express will permanently terminate at Dadar railway station throughout the block period. • Amravati to CSMT Express (Train Number 12112): Inbound traffic originating from the Vidarbha region will halt its scheduled run at Dadar railway station. • Bhubaneswar to CSMT Express (Train Number 11020): Passengers arriving from Odisha will disembark at Dadar railway station as their final railway stop. • Madgaon to CSMT Express (Train Number 22120): This vital express link from coastal Goa will finish its service journey upon reaching Dadar railway station. • Bidar to CSMT Express (Train Number 22144): Connecting northern Karnataka to Maharashtra's capital, the train will end its trip at Dadar railway station. • Latur to CSMT Express (Train Number 22108): Services originating from Latur in Marathwada will conclude their run at Dadar railway station. • Mangaluru to CSMT Express (Train Number 12134): Travelers arriving from coastal Karnataka will end their journey at Thane railway station instead of entering Mumbai proper. Travel Advisory and Verification Guidance Central Railway has urged all intending passengers to verify running schedules well before departing for their journeys to prevent last-minute confusion. Rail users can dial the integrated Indian Railways helpline 139 to confirm real-time halts and revised terminal assignments. Alternatively, travelers can access the National Train Enquiry System through the official NTES web portal to monitor live train status and confirm exact termination schedules throughout this temporary maintenance period. What this means for you Passengers traveling to south Mumbai must arrange alternate transit from Dadar or Thane until the maintenance concludes on December 15. • Across India: Long-distance express services originating from West Bengal, Odisha, Karnataka, and Goa will not enter CSMT terminal. Passengers booking these routes must account for early termination at Dadar or Thane when coordinating onward journeys. • In Mumbai: Commuters heading toward south Mumbai business districts must disembark earlier and transfer to suburban locals or road transport. This shift is likely to create increased passenger volume around Dadar and Thane platforms during arrival hours. • Travel Planning: Travelers with connecting trains or fixed appointments must budget extra transit time across the city. Early deboarding means planning for an additional 30 to 45 minutes to reach south Mumbai localities. • Status Verification: Passengers should actively verify train termination points prior to departure rather than relying on standard schedules. Real-time updates remain accessible via the national 139 helpline and digital tracking platforms. Why this happened Central Railway implemented this prolonged block to execute essential infrastructure upgrades and engineering maintenance on platforms 14, 15, and stabling line 15 at CSMT. • Platform Upgrades and Maintenance: Critical trackwork and electrical maintenance are underway at platform numbers 14 and 15 alongside stabling line 15. Executing these repairs safely necessitates complete traffic and overhead power shutdowns on those lines. • Terminal Congestion Management: With specific platforms closed for engineering work, the remaining operational tracks cannot accommodate standard train volumes without severe bottlenecks. Terminating select trains at Dadar and Thane frees crucial terminal capacity during peak periods. • Extended Duration Requirements: The comprehensive nature of the civil and electrical overhaul demands an uninterrupted 75-day window from October 1 to December 15. Normal operations on these tracks will only resume after technical safety audits verify the completed work. Questions & Answers 1. What is the duration of the maintenance block at Mumbai CSMT? The traffic and power block began on October 1 and will remain operational for 75 days, ending on December 15. 2. Which platforms at the terminal are directly affected by the work? The infrastructure work is concentrated on platform number 14, platform number 15, and stabling line 15. 3. Where will the affected express trains terminate during this period? The eight identified trains will short-terminate at either Dadar or Thane railway station instead of reaching CSMT. 4. Where will the Mangaluru Express (Train 12134) end its journey? Train number 12134 from Mangaluru will terminate its service at Thane railway station rather than traveling into CSMT. 5. How can travelers confirm updated train timings and stopping points? Passengers can check live schedules via the official NTES portal or by calling the Indian Railways helpline at 139. https://trendkia.com/en/national/chhatrapati-shivaji-maharaj-terminus-para-75-dinon-ke-kama-se-kai-pramukha-eksapresa-gariyan-dadar-aura-thane-men-hi-rukengi-41945 TrendKia — Har trend, sabse pehle.