Khandwa to Get 38 Km New Bypass and Railway Overbridge Under Rs 160 Crore Road Infrastructure Plan The PWD has finalized a DPR for a 38 km road connecting Khandwa, Sihada, and Bhainsawa at a cost of Rs 160.62 crore. The project features an Itarsi line railway overbridge and Rs 68.89 crore for land acquisition. Residents and commuters in Madhya Pradesh's Khandwa district are set to experience major connectivity improvements as the Public Works Department (PWD) completes the Detailed Project Report (DPR) for a new road connecting Khandwa, Sihada, and Bhainsawa. Spanning approximately 38 kilometers, the project carries an estimated construction budget of Rs 160.62 crore. Once constructed, this strategic corridor will function as an alternate bypass for Khandwa city, significantly alleviating urban traffic congestion while linking several rural settlements directly to a high-quality road network. Project Dimensions, Specifications, and Construction Layout According to the technical details outlined by the PWD Khandwa sub-division, the proposed 38-kilometer highway will feature a uniform width of approximately 7 meters. To ensure long-term durability, a 35.50-kilometer stretch will be constructed using asphalt carpeting, while a 2.50-kilometer section will receive heavy-duty cement-concrete paving. This infrastructure upgrade will provide a smooth, reliable transport route for passengers traveling between Khandwa, Sihada, and Bhainsawa, drastically lowering vehicle wear and transit times across the rural hinterland. Land Acquisition Expenditure and Railway Overbridge Construction Executing the project requires acquiring roughly 47.12 hectares of land along the designated route. The DPR allocates an estimated Rs 68.89 crore exclusively toward land acquisition compensation and related procedural costs. A centerpiece of the engineering plan is the construction of a new Railway Overbridge (ROB) over the busy Khandwa-Itarsi railway track. This overbridge will eliminate frequent delays caused by railway gate closures, allowing uninterrupted vehicular traffic. The route alignment initiates from the Civil Line area of Khandwa, passing through the Padela Hanuman Temple locality before merging with the Sihada and rural road connections. Urban Bypass Advantages and Area-Wide Transit Upgrades The new road arrangement is structured to serve as an outer bypass for Khandwa town. By redirecting long-distance commuters and freight movement away from central city streets, the project will ease heavy traffic bottlenecks within municipal limits. Rural travelers heading toward neighboring regions will no longer need to navigate crowded city centers. Additionally, the existing roadway near the MLA residence in the NVDA Colony region, which currently suffers from severe wear and degradation, will see a major connectivity upgrade. The completed DPR has been submitted to the State Finance Committee (SFC) for official financial clearance. Harsood Sub-Division Submits Separate Rs 7.84 Crore Road Plan In tandem with the main bypass project, rural road development is also expanding in the nearby Harsood block. The PWD sub-division in Harsood has prepared a formal proposal for a 4.79-kilometer road linking Rewapur to Kashipur. Estimated at a cost of Rs 7.84 crore, the proposed road will feature a width of 7.50 meters. The project proposal was finalized following a comprehensive field survey conducted by in-charge SDO Sajal Upadhyay and Sub-Engineer G.L. Choudhary. This proposal has likewise been forwarded to the SFC for approval, signaling a comprehensive overhaul of regional road networks across Khandwa district. What this means for you In Madhya Pradesh: The project strengthens rural road infrastructure in the Malwa-Nimar belt, facilitating smoother transport for agriculture and regional commerce. In Khandwa: Local residents will experience significant relief from inner-city traffic congestion, while commuters between Sihada, Bhainsawa, and NVDA Colony gain a faster transit route. Questions & Answers 1. What is the total length and cost of the Khandwa-Sihada-Bhainsawa road project? The proposed road spans approximately 38 kilometers with a total estimated project cost of Rs 160.62 crore. 2. What are the technical construction specifications for the 38 km road? The road will have a width of 7 meters, featuring 35.50 kilometers of bituminous paving and 2.50 kilometers of cement-concrete construction. 3. How much money is allocated for land acquisition for this corridor? An estimated Rs 68.89 crore will be spent to acquire 47.12 hectares of land required for the road alignment. 4. Does the project include a Railway Overbridge? Yes, a Railway Overbridge (ROB) will be constructed on the Khandwa-Itarsi rail section to facilitate smooth traffic across the railway lines. 5. What separate proposal has been submitted for the Harsood region? Harsood's PWD sub-division has proposed a 4.79 km road from Rewapur to Kashipur with a width of 7.50 meters at an estimated cost of Rs 7.84 crore. https://trendkia.com/en/national/sihada-aura-bhainsawa-ke-raste-khandwa-ko-milega-naya-bayapasa-160-62-karora-ke-38-kimi-roda-projekta-ka-dpr-taiyara-16592 TrendKia — Har trend, sabse pehle.