{
  "type": "article",
  "title": "New 4609 Crore Greenfield Expressway Opens Between Telangana and Andhra Pradesh, Cutting Travel Time by 2 Hours",
  "summary": "The 162.04 km long NH-365BG greenfield expressway connecting Telangana and Andhra Pradesh has opened informally to traffic. Built at a cost of 4,609 crore rupees, it reduces travel distance between Hyderabad and Visakhapatnam by 60 km.",
  "content": "Commuters traveling between Telangana and Andhra Pradesh can now access the region's first access-controlled greenfield expressway (NH-365BG), which has opened informally for vehicular movement. Traffic was permitted onto the newly constructed route starting Sunday, August 2, while an official inauguration ceremony is scheduled to take place within the coming week.\n\nProject Investment and Distance-Based Tolling\nConstructed under the ambitious Bharatmala Pariyojana initiative, the 162.04-kilometer-long expressway was built at a total expenditure of 4,609 crore rupees. According to NHAI Project Officer K. Divya, toll collection calculated strictly according to distance traveled will commence immediately after the formal inauguration. At present, engineers are carrying out load testing on a key railway overbridge along the highway to verify structural safety and load capacity prior to full-scale operations.\n\nConstruction Delays and Route Integration\nThe opening of this highway comes after a delay of several months, primarily caused by pending work on the railway overbridge located at Dhamsalapuram. While the vast majority of the expressway infrastructure had been completed nearly a year ago, the bridge work held up final clearance. With the construction now fully finalized, motorists can directly join the expressway from Tallampadu village in Khammam district and travel seamlessly to Devarapalle in Andhra Pradesh.\n\nTravel Time Savings and Regional Connectivity\nThe newly operational route brings substantial relief to commuters traveling between Hyderabad and Visakhapatnam. By utilizing this corridor, the driving distance between the two commercial hubs drops by approximately 60 kilometers, cutting travel time by 1 to 2 hours. The expressway effectively bypasses the dense urban traffic of Khammam city. Vehicles arriving from Suryapet can enter the high-speed corridor at Tallampadu and exit directly at Devarapalle, providing seamless transit for long-distance travelers heading toward Rajamahendravaram, Nuzvid, Odisha, and Kolkata.\n\nSpeed Limits, Security, and Highway Facilities\nTo ensure motorist safety, authorities have set maximum speed limits of 100 km/h for passenger cars and 80 km/h for heavy commercial vehicles. Surveillance monitoring is enforced via high-definition CCTV cameras positioned at every one-kilometer interval along the entire corridor. The infrastructure features 9 strategic interchanges to facilitate smooth entry and exit for neighboring towns. Additionally, dedicated truck parking hubs have been set up at Vandanam and Choudavaram to offer safe resting areas for freight drivers. Mirroring the tolling framework of the Hyderabad Outer Ring Road, drivers will pay toll charges corresponding only to the exact distance covered. Geographically, about 105 kilometers of the total 162.04-kilometer stretch passes through Khammam district in Telangana.\n\nWhat this means for you\nAcross India: The opening of this Bharatmala Pariyojana greenfield corridor will streamline interstate freight movement and logistics efficiency.\n\nIn Telangana and Andhra Pradesh: Bypassing congested Khammam city cuts travel distance by 60 kilometers and reduces travel time by 1 to 2 hours between Hyderabad and Visakhapatnam.\n\nQuestions & Answers\n\n1. What is the total length and construction cost of the NH-365BG expressway?\nThe greenfield expressway spans a total length of 162.04 kilometers and was constructed under the Bharatmala Pariyojana at an investment of 4,609 crore rupees.\n\n2. Which states and major cities benefit from this new route?\nThe route connects Tallampadu in Khammam district, Telangana, to Devarapalle in Andhra Pradesh, reducing travel distance between Hyderabad and Visakhapatnam by 60 km and facilitating travel toward Odisha and Kolkata.\n\n3. What are the speed limits established for vehicles on this highway?\nThe highway authorities have set speed limits of 100 km/h for passenger cars and 80 km/h for heavy commercial vehicles.\n\n4. How will toll charges be calculated on the expressway?\nToll collection will follow a distance-based model similar to the Hyderabad Outer Ring Road, charging commuters only for the exact distance traveled.\n\n5. What caused the delay in opening the NH-365BG expressway?\nThe project faced a delay of several months due to pending construction work on the railway overbridge at Dhamsalapuram, even though the main stretch was finished a year prior.",
  "url": "https://trendkia.com/en/national/telangana-aura-andhra-pradesh-ke-bicha-4609-karora-ka-naya-greenfield-expressway-khula-hyderabad-se-visakhapatnam-ka-saphara-hoga--14320",
  "category": "India",
  "publishedAt": "2026-08-06",
  "tags": [
    "Telangana",
    "Andhra Pradesh",
    "Expressway",
    "NH-365BG",
    "Khammam",
    "Bharatmala Pariyojana",
    "Hyderabad",
    "Visakhapatnam"
  ],
  "language": "en",
  "site": "TrendKia"
}