Bhagat Ki Kothi Loco Shed Boosts Safety with Kavach System and Modern Upgrades in Jodhpur The Bhagat Ki Kothi loco shed in Jodhpur has installed the Kavach safety system in half of its electric locomotives over five months while reducing engine failures and implementing eco-friendly upgrades. Major technological and safety enhancements are underway at the Bhagat Ki Kothi loco shed in Jodhpur to elevate operational reliability. Over a span of five months, the facility has successfully equipped half of its designated electric locomotives with the advanced Kavach safety system. Alongside this safety rollout, targeted technical improvements have led to a noticeable drop in locomotive failures. The shed has also introduced indigenous testing innovations, recycled valuable equipment worth crores, and adopted water conservation measures to strengthen overall maintenance operations. Expanding Kavach Installation and Reliability Out of the total 132 electric locomotives assigned to the shed, 66 units have now been fitted with the Kavach safety mechanism. Installation work for the remaining locomotives is proceeding in a phased manner, and future electric locos will roll out with the system pre-installed. These technical upgrades have yielded clear improvements in fleet reliability. When compared to the same period last year, HHP diesel locomotive failures dropped by 40 percent, while electric locomotive failures decreased by 21 percent. Furthermore, performance metrics surpassed Railway Board targets, showing a 21 percent improvement in diesel loco outages and a 6 percent improvement in electric loco outages. Indigenous Testing and Resource Optimization The shed has developed a dedicated P-pipe flow test bench using indigenous technology to inspect components before installation. This custom setup tests the oil flow and spray capacity of piston cooling pipes prior to fitting them into the engines, allowing technicians to spot defective parts early and prevent potential engine damage. In addition to optimizing technical checks, the facility focused on resource recovery by supplying 84 usable locomotive components valued at 4.73 crore rupees to various other railway workshops and production units. During a three-month window, the team also completed major maintenance schedules for 10 electric locos and 11 HHP diesel locos. Water Conservation and Future Outlook Environmental sustainability remains a key focus at the facility, with the implementation of waterless urinals across 77 of its 181 electric locomotives to minimize water consumption while streamlining maintenance routines. Divisional Railway Manager Anurag Tripathi stated that modern technology, quality upkeep, and domestic innovations are collectively reinforcing the railway commitment to safety. These comprehensive upgrades extend beyond routine maintenance, playing a vital role in ensuring that trains running on the tracks operate with enhanced security, reliability, and efficiency. What this means for you Across India: The expansion of modern safety technologies across the railway network will make train operations more secure and dependable. In Jodhpur: Technical upgrades and safety installations at the local loco shed are strengthening regional railway maintenance and operational standards. Questions & Answers 1. How many electric locomotives have been fitted with the Kavach system at the Bhagat Ki Kothi loco shed? The Kavach safety system has been installed in 66 out of the 132 designated electric locomotives within a span of five months. 2. What percentage reduction was recorded in locomotive failures? Compared to the same period last year, HHP diesel locomotive failures dropped by 40 percent and electric locomotive failures decreased by 21 percent. 3. What is the purpose of the P-pipe flow test bench? It checks the oil flow and spray capacity of piston cooling pipes before they are fitted into engines, allowing technicians to identify defective parts early. 4. What is the value of the locomotive components supplied to other units? Usable locomotive components valued at 4.73 crore rupees have been supplied to various railway sheds, workshops, and production units. https://trendkia.com/en/rajasthan/jodhapura-ke-bhagat-ki-kothi-loko-sheda-men-suraksha-majabuta-66-injanon-men-laga-kavach-sistama-21625 TrendKia — Har trend, sabse pehle.