# Survey Begins For Proposed 191 Km Rewari Jaipur Direct Rail Corridor Connecting Key Industrial Hubs

> A survey budgeted at Rs 5.73 crore has commenced for a new 191-kilometer railway line between Rewari and Jaipur, aimed at reducing congestion on the existing Alwar-Bandikui route and connecting industrial hubs like Neemrana.

**Type:** article · **Category:** Rajasthan · **Published:** 2026-11-19 · **Source:** TrendKia
**Canonical:** https://trendkia.com/en/rajasthan/haryana-aura-rajasthan-ke-bicha-191-kimi-lnbi-nai-rela-laina-ka-sarve-shuru-kai-pramukha-kasbon-ko-milegi-sidhi-kanektiviti-61290 · **Language:** English
**Tags:** Rewari Jaipur Rail Line, Indian Railways, Railway Survey, Neemrana Rail Connectivity, Rao Rajendra Singh, Ashwini Vaishnaw

A comprehensive engineering survey has commenced for a direct 191-kilometer railway track linking Rewari in Haryana with Jaipur in Rajasthan. Budgeted at 5.73 crore rupees, this feasibility study marks the initial phase of a major infrastructure initiative designed to streamline transit across northern and western India, providing enhanced transport options to hundreds of thousands of commuters daily across Delhi, Haryana, and Rajasthan.

## Proposed Alignment and Direct Route Network
The proposed railway line will originate in the Rewari district of Haryana and pass through Bawal, Shahjahanpur, Neemrana, Behror, Kotputli, Raghunathpura, Pragpura, Paota, Shahpura, and Manoharpur before reaching Jaipur. Land acquisition procedures will be conducted across approximately 34 villages in Rewari, with the local district administration scheduled to release the finalized list of affected villages shortly. After exiting Haryana, the track crosses into the Alwar district of Rajasthan, serving key towns including Shahjahanpur, Neemrana, and Behror. Notably, Neemrana forms a crucial hub within the Delhi-Mumbai Industrial Corridor but has previously lacked direct railway connectivity.

## Relieving Traffic Pressure and Regional Connectivity Boost
Currently, rail traffic moving between Rewari and Jaipur relies entirely on a single existing route via Alwar and Bandikui. Heavy traffic on this section frequently causes delays and operational bottlenecks. Constructing the new direct alignment will significantly relieve congestion on the Alwar-Bandikui route while reducing total travel time. Furthermore, the project will bring rail service to hundreds of villages in the region for the first time, generating new economic activities and employment opportunities. The corridor will also provide an efficient feeder link for long-distance transport toward Gujarat and Maharashtra.

## Official Approvals and Track Doubling Expansion
Jaipur Rural BJP Member of Parliament Rao Rajendra Singh recently met Railway Minister Ashwini Vaishnaw to discuss the project's progress. Following the completion and finalization of the Detailed Project Report (DPR), formal construction authorization will be granted. The MP also requested the development of the proposed Sundarpura railway station and the redevelopment of Badhal railway station along the Jaipur-Ringas line. Alongside the new line, plans are progressing to double a 308-kilometer single-track section on the primary Delhi-Rewari-Jaipur route originating from Delhi Sarai Rohilla and Delhi Cantt, which currently handles premium services including the Delhi-Ajmer Vande Bharat Express and the Delhi-Jaipur Double Decker Express.

## What this means for you
The proposed direct railway corridor will significantly benefit daily commuters, logistics operators, and businesses across Haryana, Rajasthan, and the National Capital Region.

- **In Haryana and Rajasthan:** Passengers traveling between Rewari, Neemrana, Kotputli, and Jaipur will experience shorter travel times and more reliable service. Direct rail connectivity to Neemrana industrial hub will spur commercial growth and generate local employment opportunities.
- **Across India:** The line creates an efficient alternate rail link connecting northern states to Gujarat and Maharashtra. Reducing traffic congestion along the congested Alwar-Bandikui section will improve overall train punctuality between Delhi and Jaipur.

## Why this happened
The survey for the new Rewari-Jaipur rail line was initiated to address heavy congestion on the current rail corridor and fulfill regional industrial development needs.

- **Heavy Traffic on Existing Route:** Trains currently operate via a single corridor through Alwar and Bandikui, resulting in frequent operational bottlenecks and delays.
- **Industrial Corridor Connectivity:** Neemrana is a core component of the Delhi-Mumbai Industrial Corridor but lacked direct rail network access.
- **Parliamentary Push:** Jaipur Rural BJP MP Rao Rajendra Singh pursued the project with Railway Minister Ashwini Vaishnaw to accelerate formal sanctioning.

## Questions & Answers

### 1. What is the total length of the proposed Rewari-Jaipur new railway line?
The proposed new railway line will stretch across a total length of 191 kilometers.

### 2. What is the budget allocated for the survey of this rail project?
A budget of Rs 5.73 crore has been allocated to carry out the initial survey for the railway line.

### 3. Which major towns will the new rail line pass through?
Starting from Rewari in Haryana, the rail line will pass through Bawal, Shahjahanpur, Neemrana, Behror, Kotputli, Pragpura, Paota, Shahpura, and Manoharpur before reaching Jaipur.

### 4. How many villages in Rewari will be affected by land acquisition?
Land will be acquired across approximately 34 villages in the Rewari district for the new rail line.

### 5. How many kilometers of the Delhi-Rewari-Jaipur route will be doubled?
A 308-kilometer single-track section along the main Delhi-Rewari-Jaipur route will be upgraded to a double-track line.

---
_TrendKia — Har trend, sabse pehle.. Machine-readable view; canonical HTML at the URL above._