In an effort to unclog major arterial corridors and create frictionless access for transit users across the national capital, several transformative infrastructure clearances were granted on Wednesday. A high-level governing body meeting of the Unified Traffic and Transportation Infrastructure (Planning and Engineering) Centre (UTTIPEC), presided over by Delhi Lieutenant Governor Taranjit Singh Sandhu, cleared multi-modal integration (MMI) blue-prints for six key metro locations alongside two flagship roadway engineering projects helmed by the Public Works Department (PWD).
The impact of these decisions is expected to resonate across some of Delhi's most densely traversed corridors, where daily commuters routinely grapple with chaotic entry and exit points, missing pedestrian infrastructure, and bottlenecks created by disorganized road transport. The core ethos of multimodal integration focuses on bridging the gap between rapid rail transit, local feeder networks, cyclists, and pedestrians using non-motorized transport.
Transforming Infrastructure Across 6 Crucial Metro Hubs
The six stations sanctioned for comprehensive MMI transformation by UTTIPEC include GTB Nagar, Sarita Vihar, Akshardham, Rohini West/Dr. Baba Saheb Ambedkar Hospital, Malviya Nagar, and Shastri Park.
Multimodal integration reaches far beyond standard surface road repairs. The framework reorganizes the perimeter surrounding each station into an interconnected transit interchange. This entails laying out clear pedestrian pathways, demarcating safe staging bays for auto-rickshaws and e-rickshaws, establishing organized street crossings, and creating dedicated non-motorized vehicle lanes. By eliminating ad-hoc parking and street-level confusion outside station gates, passengers can transition seamlessly between metro platforms and street-level transit options.
All 31 Corridor Stations Now Fully Cleared Under MMI Scheme
The Delhi Metro Rail Corporation (DMRC) had initially drafted comprehensive MMI layouts covering 31 stations across its Phase-1 and Phase-2 networks. With the nod given to this latest cluster of six stations, all 31 proposed MMI schemes have secured formal UTTIPEC clearance.
This clean slate of regulatory approvals enables executing agencies to transition directly into ground-level development and procurement. Prior UTTIPEC planning directives have consistently stressed treating last-mile connectivity, foot-traffic safety, and surface vehicular movement as a single integrated ecosystem rather than disconnected segments.
5.5-Kilometre Elevated Corridor Across Maa Anandmayee Marg
To untangle congested arterial links in South Delhi, the authority approved PWD's blueprint for an approximately 5.5-kilometre long, six-lane elevated corridor along Maa Anandmayee Marg. This major elevated structure forms an integral link designed to bridge the Outer Ring Road with the Mehrauli-Badarpur Road.
The defining operational benefit of this elevated highway lies in its ability to completely bypass roughly 12 traffic intersections along Maa Anandmayee Marg. By taking cross-city vehicular flow above street level, the highway eliminates the perpetual stop-and-go delays caused by dense traffic signals.
Motorists commuting to and from the industrial complexes of Okhla Phase-1 and Phase-2 are positioned to benefit significantly from this upgrade. Heavy commercial and employee vehicular traffic emerging from these commercial belts has long overloaded adjoining surface streets, an issue the elevated bypass aims to mitigate decisively.
Grade-Separated Underpass and Roundabout for Okhla Estate Road
Addressing internal bottlenecks within Okhla's industrial zone, the governing body cleared an underpass paired with an expansive roundabout near the Crown Plaza junction situated along Okhla Estate Road.
This grade-separated intervention seeks to relieve dense vehicular friction at the ground plane. By diverting through-traffic into an underpass, municipal planners will free up ample street-level real estate to incorporate pedestrian-safe footpaths and cycle-friendly non-motorized transit corridors.
Mukarba Chowk Decongestion: 10-Lane ROB Widening and Railway Link
A multi-pronged engineering intervention was also ratified to unclog Mukarba Chowk, long recognized as one of Delhi's most choked transit nodes. Under the approved proposal, the existing Road Over Bridge (ROB) traversing the Outer Ring Road will be widened from six lanes to 10 lanes. Concurrently, a separate four-lane bridge is planned over the Delhi-Sonipat railway tracks to forge a direct connection between Jahangirpuri Industrial Area and Sanjay Gandhi Transport Nagar.
Engineering projections by the PWD suggest that once this dedicated connector is operational, approximately 20 percent of the traffic volume currently converging at Mukarba Chowk can be diverted away along this alternative loop. This shift is expected to provide substantial relief to Mukarba Chowk as well as National Highway 44 (NH-44).
Achieving rapid execution will demand synchronized multi-agency collaboration. The sanctioning session was attended by senior leadership representing the DDA, Delhi Government, the Ministry of Housing and Urban Affairs, Delhi Traffic Police, DMRC, PWD, MCD, NDMC, Indian Railways, and the NCRTC.


















