A massive new transport project is in the works to transform connectivity in the National Capital Region. The National Capital Region Transport Corporation is moving forward with plans to establish a high-speed mass transit system linking Ghaziabad and Jewar Airport. Under this initiative, a high-speed regional metro corridor will be constructed, starting from Ghaziabad and passing through Greater Noida West, Surajpur, Greater Noida, Dadupur, and Dankaur before terminating at the Noida International Airport in Jewar. Spanning a length of approximately 72 kilometers, the corridor is slated to feature about 22 metro stations along its route.
Project Report and Cost Breakdown
The detailed project report for this high-speed rail corridor has already been finalized. According to the findings, out of the 72 kilometers, roughly 71.5 kilometers will be constructed as an elevated section, while only 1.29 kilometers will run underground. The elevated structure will stretch from Ghaziabad all the way to YEIDA Sector 30. Meanwhile, the underground portion will be restricted strictly to the vicinity of Terminal 1 of the Noida International Airport and the airport's Ground Transportation Center. The transport corporation aims to commence rail operations on this corridor by the year 2030, with total construction expenditures estimated at approximately 21,000 crore rupees.
Shared Tracks for Metro and High-Speed Trains
One of the most notable features of this infrastructure project is that the tracks will accommodate both normal metro services and high-speed rail operations. Certain stations along the route will serve as common stops for both train types, while others will cater exclusively to metro operations. Current operational plans dictate that 11 stations will facilitate both rapid rail and metro services, whereas another 11 stations will handle purely local metro movement. The high-speed trains will halt at selected major stations, while the metro trains will run frequently to serve the daily commuting needs of local residents.
Station Layout and Network Expansion
Authorities have outlined a clear bifurcation of stations based on their operational capabilities. Stations equipped for both rapid rail and metro services include Ghaziabad, Ghaziabad South, Greater Noida Sector 2, Greater Noida Sector 12, Surajpur, Alpha-1, Ecotech-6, Dankaur, YEIDA North Sector 18, YEIDA Central Sector 21, and the Noida International Airport station. Conversely, stations dedicated exclusively to local metro transit include Siddharth Vihar, Greater Noida Sector 16C, Eco Tech 12, Greater Noida Sector 3, Greater Noida Sector 10, Knowledge Park 5, Police Lines Surajpur, Ecotech 2, Knowledge Park 3, Omega 2, and Ecotech 1E. Additional future stations have also been mapped out for subsequent phases of network integration.



















