Ambala to Shamli travel time to shrink as 6-lane Rs 4900 crore expressway takes shapeHaryana
10 Sept 2026, 6:22 pm (1 hour ago)· 3

Ambala to Shamli travel time to shrink as 6-lane Rs 4900 crore expressway takes shape

Construction of the Ambala-Shamli greenfield expressway is progressing rapidly with 70 percent work completed, cutting travel time between Haryana and Uttar Pradesh to just 1.5 hours.

Commuters traveling regularly between Haryana and western Uttar Pradesh have received a major relief update regarding regional connectivity. The construction work on the 6-lane greenfield expressway running between Ambala and Shamli is advancing at a rapid pace, with approximately 70 percent of the project already completed. This upcoming expressway is set to act as a major gamechanger for the transportation network across northern India. Once it becomes fully operational, the lengthy 3-hour journey between Ambala and Shamli will be drastically reduced to a mere 1.5 hours or 90 minutes.

Cost of Rs 4900 Crore and Length of 121.78 Kilometers

The entire infrastructure project involves an expenditure of around Rs 4,900 crore. Spanning a total length of 121.78 kilometers, this high-speed corridor is being jointly constructed by three different building firms. A 75-kilometer stretch of this expressway falls within the state of Haryana, while the remaining 45-kilometer portion lies inside the boundaries of Uttar Pradesh. The construction work commenced in 2023, and according to the set target, the route will be fully opened to vehicular traffic by March 2027.

Also read

Districts Covered Along the Route

At present, there is no direct four-lane or expressway link available for traveling from Ambala to Shamli. People are forced to take a lengthy detour via Karnal, where heavy traffic congestion results in wasting more than 3 hours of travel time. The new expressway will originate from the Ambala-Chandigarh road and extend up to Thana Bhawan in Shamli. It will cover four prominent districts of Haryana including Ambala, Kurukshetra, Karnal, and Yamunanagar. Afterward, it will enter Uttar Pradesh to connect directly with Saharanpur and Shamli districts.

Interconnected Network with Three Major Expressways

The defining feature of this expressway is its multi-connectivity network. It will link three major and vital transportation routes together. At Gogwan Jalalpur in Shamli, it will intersect with the Delhi-Saharanpur-Dehradun Economic Corridor. At Sadalpur, it will connect with the Ambala-Chandigarh and Ambala-Mohali routes. Passing through Ambala, it will also provide direct traffic flow to the Ludhiana-Ambritsar route. This robust interconnectivity will directly benefit travelers commuting from Punjab and Rajasthan alongside Haryana and Uttar Pradesh.

World-Class Amenities Along the Way

On the lines of the Delhi-Dehradun expressway, modern rest areas are being constructed along the Ambala-Shamli expressway for the convenience of passengers. Facilities such as fuel pumps, CNG stations, clean restrooms, food courts, restaurants, and advanced vehicle parking and charging points will be available here so that long-distance travelers do not face any difficulties during their journey.

A Boon for Business Owners and Farmers

This expressway will not only save valuable time for regular commuters but will also inject fresh momentum into the economies of both states. The major manufacturing belt of Ambala, Yamunanagar's nationwide famous plywood industry, and the sugar mills located in Shamli and Muzaffarnagar will secure a direct and smooth passage. Cargo trucks will be liberated from winding roads and traffic jams, resulting in substantial fuel savings and a significant reduction in overall logistics costs.

Questions & Answers

What is the total length of the Ambala-Shamli expressway?
The expressway spans a total length of 121.78 kilometers.
How much is the total cost of this expressway project?
The entire project involves an estimated cost of around Rs 4,900 crore.
When is the expressway scheduled to be completed?
According to the set target, it will be fully opened to traffic by March 2027.
How much will the travel time be reduced?
The travel time between Ambala and Shamli will drop from 3 hours to just 1.5 hours.
Which Haryana districts will the expressway cover?
It will pass through the districts of Ambala, Kurukshetra, Karnal, and Yamunanagar.

Comments 0

No comments yet — be the first.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR