Keoladeo National Park Secures Fresh Water Supply as Rs 18.52 Crore Channel Project Wins ApprovalRajasthan
10 Oct 2026, 6:23 am (1 hour ago)· 0

Keoladeo National Park Secures Fresh Water Supply as Rs 18.52 Crore Channel Project Wins Approval

The government has approved an Rs 18.52 crore project to construct a 1250-metre feeder canal linking the Bandh Baretha water system to Keoladeo National Park via Ajan Dam.

A major infrastructure push aimed at eliminating recurring water shortages at the globally renowned Keoladeo National Park in Bharatpur, Rajasthan, has received formal clearance from the government. The initiative centers on integrating the wetland ecosystem with the Bandh Baretha water network to ensure an assured and steady water supply throughout the year. At the heart of this comprehensive plan lies the construction of a 1250-metre-long connecting canal, which will be built with an approved financial outlay of Rs 18.52 crore. Once functional, this channel will route water through the Ajan Dam directly into Ghana, securing the ecological foundations of the sanctuary.

Protecting Avian Habitats and Breeding Grounds

Keoladeo National Park occupies a prominent place on the global conservation map owing to its unique biodiversity and its role as a vital sanctuary for migratory birds. Every year with the onset of the winter season, vast flocks of winged visitors travel thousands of miles from diverse domestic and international habitats to settle across these shallow wetlands. Adequate water levels across the marshlands are an absolute prerequisite for their feeding patterns, natural shelter, and successful breeding. Park authorities noted that a shortage of water across the wetland reservoirs disrupts the foraging ecosystem, causing immediate harm to both nesting activity and reproductive cycles. Linking the park with the Bandh Baretha water network was conceived precisely to prevent such habitat degradation.

Also read

Connecting Bandh Baretha to Ajan Dam via a Feeder Channel

Under the sanctioned framework, the proposed 1250-metre canal will function as a vital feeder conduit. Water from the Bandh Baretha reservoir system will be diverted through this designated alignment toward Ajan Dam, from where controlled releases can be fed directly into Keoladeo National Park. Establishing this systematic flow path will significantly streamline water management, allowing park managers to replenish dried wetlands systematically rather than leaving the sanctuary at the mercy of unpredictable local monsoon runoffs.

Reviving Wetland Health and Eco-Tourism

The canal project is widely viewed as a pivotal milestone for the long-term preservation of the Keoladeo sanctuary. With its completion, park officials anticipate a measurable improvement in overall water availability across the entire wetland reserve. Sustained hydration will keep sensitive aquatic zones healthy and breeding colonies secure, while simultaneously offering visiting birdwatchers and nature enthusiasts a lush, biodiverse winter environment. Following the government sanction, park administration teams have officially commenced groundwork to push the development toward completion.

Questions & Answers

What project has been approved for Keoladeo National Park?
A project to construct a 1250-metre connecting canal linking the Bandh Baretha water network to the sanctuary has been approved.
What is the total sanctioned budget for this canal?
The project has been sanctioned with an estimated financial outlay of Rs 18.52 crore.
How will water reach the park through this system?
The canal will channel water from the Bandh Baretha network into Ajan Dam, from where it will be released into Keoladeo National Park.
Why is regular water supply critical for the park?
Adequate water is essential to maintain food supplies, nesting habitats, and breeding activities for thousands of winter migratory birds.
What effect will this have on tourism?
Improved water levels will preserve the lush wetland landscape and sustain bird numbers, providing a richer experience for winter tourists.

Comments 4

Arjun Mehta@arjun-mehta·just now

When I visited Bharatpur last time, I saw fewer birds and the guide complained about water scarcity. Hopefully, this canal will improve things and our guests will return on time.

Ravikash Gupta@ravikash·just now

Spot on, Arjun. Do you think this 18-crore canal will actually be ready before the migratory birds arrive this winter?

Rohan Verma@rohan-verma·22m ago

Eighteen crore rupees is a big amount, but will just a 1200-metre canal really solve the water crisis in Bharatpur permanently? If maintenance and leaks are ignored, the water might never reach where it's needed most.

Karan Malhotra@karan-malhotra·21m ago

You're right, Rohan. But will there be a dedicated committee for maintenance after the canal is built?

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp