A major infrastructure push aimed at eliminating recurring water shortages at the globally renowned Keoladeo National Park in Bharatpur, Rajasthan, has received formal clearance from the government. The initiative centers on integrating the wetland ecosystem with the Bandh Baretha water network to ensure an assured and steady water supply throughout the year. At the heart of this comprehensive plan lies the construction of a 1250-metre-long connecting canal, which will be built with an approved financial outlay of Rs 18.52 crore. Once functional, this channel will route water through the Ajan Dam directly into Ghana, securing the ecological foundations of the sanctuary.
Protecting Avian Habitats and Breeding Grounds
Keoladeo National Park occupies a prominent place on the global conservation map owing to its unique biodiversity and its role as a vital sanctuary for migratory birds. Every year with the onset of the winter season, vast flocks of winged visitors travel thousands of miles from diverse domestic and international habitats to settle across these shallow wetlands. Adequate water levels across the marshlands are an absolute prerequisite for their feeding patterns, natural shelter, and successful breeding. Park authorities noted that a shortage of water across the wetland reservoirs disrupts the foraging ecosystem, causing immediate harm to both nesting activity and reproductive cycles. Linking the park with the Bandh Baretha water network was conceived precisely to prevent such habitat degradation.
Connecting Bandh Baretha to Ajan Dam via a Feeder Channel
Under the sanctioned framework, the proposed 1250-metre canal will function as a vital feeder conduit. Water from the Bandh Baretha reservoir system will be diverted through this designated alignment toward Ajan Dam, from where controlled releases can be fed directly into Keoladeo National Park. Establishing this systematic flow path will significantly streamline water management, allowing park managers to replenish dried wetlands systematically rather than leaving the sanctuary at the mercy of unpredictable local monsoon runoffs.
Reviving Wetland Health and Eco-Tourism
The canal project is widely viewed as a pivotal milestone for the long-term preservation of the Keoladeo sanctuary. With its completion, park officials anticipate a measurable improvement in overall water availability across the entire wetland reserve. Sustained hydration will keep sensitive aquatic zones healthy and breeding colonies secure, while simultaneously offering visiting birdwatchers and nature enthusiasts a lush, biodiverse winter environment. Following the government sanction, park administration teams have officially commenced groundwork to push the development toward completion.






















