Key construction steps for building a duplex or simplex home without stressLifestyle
13 Oct 2026, 3:20 am (30 min ago)· 0

Key construction steps for building a duplex or simplex home without stress

Building your own duplex or simplex home requires careful planning and material selection to avoid stress and extra costs. Expert Rajiv Gupta shares essential guidelines for constructing a durable and modern house.

In the wake of the pandemic, the cultural preference for large flats, duplexes, and simplex homes has experienced a notable surge. Constructing a house on one's own land remains a major aspiration for many individuals, yet embarking on this journey without proper planning and adequate knowledge can prove to be both expensive and nerve-wracking. To build a trendy, strong, and durable home during the 2025-2026 period, understanding a few selective and crucial phases is exceptionally important. Drawing on insights from Rajiv Gupta, who has spent the last 10 years engaged in independent house construction in Patna, the entire process of creating an exceptional home can be approached in an extremely straightforward and effective manner.

Planning and essential architectural drawings

The commencement of any construction project invariably begins with robust planning. For this phase, property owners need to have primarily three distinct types of drawings ready. These include a 2D or 3D layout drawing that clarifies the precise locations of every room, the kitchen, and the bathroom. It also involves a structural detail drawing containing comprehensive information regarding the steel reinforcement required for columns and footings, along with an elevation drawing that outlines the exterior aesthetic and design of the building.

Also read

Additionally, selecting the right contractor is a pivotal decision. Owners generally have two main options, which are hiring a labor-only contractor or a full-material contractor. If an individual lacks a solid understanding of construction work, opting for the full-material route is generally the better choice, provided a strict agreement detailing completion deadlines and material specifications is signed with the contractor.

Construction and foundation work

Once the planning phase concludes, actual work begins on the ground. During the excavation of the foundation footings, close attention must be paid to the dimensions and depth specified in the blueprints, with a footing size of at least 5×5 feet considered ideal. When handling concrete work, it is vital to ensure that M25 grade or a superior mix is utilized, accompanied by the proper application of a vibrator to eliminate any potential air gaps.

Following the foundation phase, backfilling the earth requires ensuring that large stones are excluded, and an anti-termite treatment should be executed to ward off future infestations. Subsequently, the plinth beam ought to be positioned 2 to 3 feet above the road level, which effectively prevents the structure from settling and stops wall cracks from developing. To permanently eliminate dampness issues, installing a high-quality damp proof course or applying a chemical coating on the plinth is strongly recommended.

Walls, lintels, and roof casting rules

As the construction progresses upward, pouring a concrete band at a height of roughly 3 feet while leaving space for windows serves to substantially enhance the overall structural integrity of the house. Similarly, a roof level or lintel beam is introduced at a height of 7 feet. During the slab casting process, maintaining a thickness of around 6 inches alongside proper reinforcement steel and adequate shuttering is essential. Furthermore, when plastering work gets underway, a ratio of 1:5 or 1:6 should be maintained, and the finished plaster must undergo curing with water for a minimum of 10 days to prevent wall cracks.

Given the scarcity of time caused by fast-paced lifestyles, individuals who choose to outsource their home construction to contractors should pay heed to vital precautions. Every single material utilized by the contractor, including bricks, cement, steel rods, concrete, sand, and paint, must be scrutinized for quality at every stage. In the modern era of the internet, checking various product brands online has become easily accessible. Furthermore, spending a few hours visiting market shops helps owners understand the differences between superior and inferior material qualities. Similarly, verifying the quality of electrical wiring and water pipes is crucial, as replacing them once installed is exceedingly difficult. While purchasing materials independently and handing them over to the contractor is ideal, gathering quality insights becomes indispensable if the contractor handles the procurement.

Finishing, interiors, and trendy aesthetics

To give the interior spaces of the house a modern and open ambiance, selecting large-sized tiles measuring at least 2×4 feet or larger is recommended, with bright white and neutral tones currently enjoying widespread popularity. Walls can be styled affordably and attractively through simple molding paneling, wallpaper, or HDHMR panels. Regarding illumination, embracing a three-layer lighting concept incorporating false ceiling lights, wall lamps, and standing lamps creates an inviting atmosphere. Finally, limiting exterior elevation paint selections to two or a maximum of three colors ensures that the overall appearance of the house remains classy and sober.

Questions & Answers

How many primary types of drawings are needed when building a house?
Property owners should have a 2D/3D layout drawing, a structural detail drawing, and an elevation drawing.
What is considered the ideal size for foundation footings?
A footing size of at least 5×5 feet is regarded as ideal for construction work.
Which concrete grade is recommended for construction?
It is always recommended to use M25 grade concrete or a superior mix during construction.
How high should the plinth beam be positioned above the road?
The plinth beam should be kept 2 to 3 feet above the road level to prevent structural settling.
What ratio should be used for wall plastering?
Plastering work should utilize a ratio of either 1:5 or 1:6.

Comments 0

No comments yet — be the first.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp