Lohit River Gets 460-Foot Meshai Hybrid Bridge to Strengthen Arunachal Border TravelArunachal Pradesh
4 Nov 2026, 11:53 am (7 min ago)· 0

Lohit River Gets 460-Foot Meshai Hybrid Bridge to Strengthen Arunachal Border Travel

A newly constructed 460-foot bridge over the Lohit river in Anjaw district will streamline troop movement and civilian transit to remote frontiers like Dong and Kaho.

Border infrastructure in the northeastern frontier received a major boost following the formal commissioning of a 460-foot-long bridge across the Lohit river in the Anjaw district of Arunachal Pradesh. Border Roads Director General Lt Gen Harpal Singh inaugurated the vital crossing, known as the Meshai Hybrid Bridge, establishing dependable physical links with isolated settlements positioned right near the frontier.

Project Udayak Overcomes Challenging Terrain

The structure was constructed by the 1444 Bridge Construction Company functioning under the Border Roads Organisation (BRO) Project Udayak. Virtually addressing the event, Lt Gen Singh commended the engineering personnel for finishing the demanding task within a remarkably compressed timeline despite rough topography and inclement weather patterns. He highlighted that the project marks an essential achievement, particularly because earlier river crossings in the area repeatedly endured severe damage during heavy monsoon downpours.

Also read

Crucial Access to Strategic Border Outposts

The on-site ceremony at Meshai village drew several key officials, including Project Udayak Chief Engineer S K Verma and 48 Border Roads Task Force Commanding Officer Pankaj Swasat, alongside personnel from the Army, Indo-Tibetan Border Police, local administration, and resident community members. The newly built bridge provides direct, reliable overland connectivity to strategic habitations located beyond Walong, notably Meshai, Dong, and Kaho.

Facilitating Local Movement and Regional Tourism

Official assessments indicate that the operational crossing will substantially upgrade roadway corridors connecting Walong, Kibithu, and Kaho along the Indo-Tibetan frontier line. Beyond expediting operational deployments for security contingents, the bridge eases everyday transportation for local villagers. The improved accessibility is also expected to invigorate travel and sight-seeing across the scenic border landscape, drawing visitors to its dramatic natural vistas.

Questions & Answers

What is the official name of the new bridge over the Lohit river?
The newly inaugurated structure is named the Meshai Hybrid Bridge.
What is the total length of the Meshai Hybrid Bridge?
The bridge measures exactly 460 feet in length.
Which organisation and unit constructed the bridge?
It was built by the 1444 Bridge Construction Company under the Border Roads Organisation's Project Udayak.
Who inaugurated the bridge and how was the ceremony conducted?
Border Roads Director General Lt Gen Harpal Singh inaugurated the bridge virtually.
Which strategic settlements benefit directly from this bridge?
The bridge improves access to remote border settlements beyond Walong, including Meshai, Dong, and Kaho.
Who attended the ground ceremony held at Meshai village?
Attendees included Chief Engineer S K Verma, Commanding Officer Pankaj Swasat, personnel from the Army and ITBP, local officials, and villagers.

Comments 0

No comments yet — be the first.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp