Muck on Tracks Halts Bairabi-Sairang Rail Line in Mizoram, Several Express Trains CancelledMizoram
1 Oct 2026, 12:18 pm (1 hour ago)· 0

Muck on Tracks Halts Bairabi-Sairang Rail Line in Mizoram, Several Express Trains Cancelled

Torrential rains caused heavy waterlogging and mud accumulation between Kawnpui and Mualkhang stations, forcing the suspension of train traffic along Mizoram's Bairabi-Sairang section. Northeast Frontier Railway has arranged 20 feeder buses at Bairabi while cancelling and short-terminating multiple key services.

Railway operations along the vital Bairabi-Sairang corridor in Mizoram came to a sudden halt on Wednesday following intense rainfall in the region. The downpour triggered an overflow of rainwater and mud onto the tracks between Kawnpui and Mualkhang, creating dangerous obstructions that prompted the Northeast Frontier Railway to temporarily halt train movements across the affected stretch as a precautionary safety measure.

Safety Protocol Enacted and Restoration Underway

Railway authorities explained that the decision to halt operations was implemented to avert any safety risks following track obstructions caused by the sludge. Engineering teams and ground personnel immediately mobilized to inspect the damaged segment, initiating clearing operations and restorative repairs to make the rail corridor operational again. Normal traffic will resume once technical evaluations confirm the track is fully safe for transit.

Also read

Twenty Feeder Buses Arranged for Stranded Travellers

To alleviate the hardship faced by passengers caught mid-journey due to the abrupt disruption, railway officials stationed a fleet of 20 buses at Bairabi station. These vehicles were deployed to transport passengers arriving on the Kolkata-Sairang Express and the Silchar-Sairang Express directly to Sairang and the capital city of Aizawl, ensuring travelers could reach their final destinations without extended delays.

Comprehensive List of Cancelled and Short-Terminated Services

The disruption has heavily impacted train movement on this strategic route connecting Mizoram's capital region to the broader national rail network. Authorities confirmed that the Sairang-Guwahati Express scheduled for departure on September 30 and the Sairang-Silchar Express scheduled for October 1 have been completely cancelled. Furthermore, several key long-distance services have been truncated

  • The Silchar-Sairang Express that commenced on Wednesday is now terminating at Bairabi, leaving its Bairabi-Sairang segment cancelled.
  • The Kolkata-Sairang Express which began its run on September 29 will also end its journey at Bairabi, with the remaining leg to Sairang called off.
  • The Sairang-Kolkata Express scheduled to leave on October 1 will now originate from Hailakandi instead, cancelling operations between Sairang and Hailakandi.
  • The Guwahati-Sairang Express that departed on Wednesday will terminate short at Hailakandi, cancelling the Hailakandi-Sairang portion of the route.

Railway administrators have urged all ticket holders and prospective passengers to carefully review the revised operational timetables and make necessary travel adjustments before heading to stations.

Questions & Answers

Why were train services halted on the Bairabi-Sairang section?
Heavy rain caused water and mud to accumulate on the tracks between Kawnpui and Mualkhang, forcing authorities to suspend traffic for passenger safety.
What alternative arrangements have been made for stranded passengers?
Railway authorities deployed 20 buses at Bairabi to transport stranded travelers to Sairang and Aizawl.
Which trains have been cancelled completely?
The Sairang-Guwahati Express scheduled for September 30 and the Sairang-Silchar Express scheduled for October 1 have been cancelled.
Where will the Kolkata-Sairang and Silchar-Sairang Express trains terminate?
Both trains will terminate early at Bairabi station, with their onward runs to Sairang cancelled.
What are the changes for the Guwahati and Kolkata services originating or terminating near Sairang?
The Guwahati-Sairang Express terminates at Hailakandi, and the Sairang-Kolkata Express on October 1 will start its journey from Hailakandi instead of Sairang.

Comments 3

Ayesha Siddiqui@ayesha-siddiqui·29m ago

Arranging twenty buses at Bairabi for stranded passengers is a relief. At least people will be able to reach home by road.

Karan Malhotra@karan-malhotra·50m ago

Monsoon disruptions on tracks in the northeast are nothing new, prioritizing safety is right but bus arrangements for passengers must run on time.

Ravikash Gupta@ravikash·49m ago

Spot on, Karan. Such disruptions in the Northeast severely hit logistics and supply chains, stalling timely movement for both freight and commuters.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp