Travel across challenging terrains and crowded urban centers in Assam is set for a structural upgrade following the state cabinet's approval of a Ropeway Development Agreement. Partnering with National Highways Logistics Management Limited (NHLML), the initiative focuses on laying down five modern cable transit corridors across diverse districts. The strategic plan is designed to enhance last-mile access, reduce street congestion, and open up premier scenic and spiritual destinations to wider tourist footfall.
Public Partnership Structure and Ownership
To execute the infrastructure work, the state administration is teaming up with NHLML, a wholly owned subsidiary operating under the National Highways Authority of India (NHAI) within the Ministry of Road Transport and Highways. Under this joint corporate model, the central government will hold a controlling 51 per cent equity stake, while the government of Assam will retain the remaining 49 per cent share.
Assam Chief Minister Himanta Biswa Sarma outlined the formal cabinet decision on Tuesday, explaining that this collaborative entity will steer the execution of all five ropeway undertakings. He emphasized that establishing dedicated aerial transit will significantly ease daily transit bottlenecks while linking critical regional hubs efficiently.
Locations and Technical Reach of the Five Corridors
The approved plan spans four key districts, establishing transit links tailored to both daily commuters and visiting pilgrims
- Kamakhya Railway Station to Kamakhya Temple: Covering 1.43 km in Kamrup Metropolitan district, this route will provide direct transit for visitors climbing up to the revered shrine.
- Khanapara to Guwahati Railway Station: An extensive 11-km aerial corridor within Kamrup Metropolitan designed to decongest central urban traffic arteries.
- Ganganagar Part-VII to Bhuban Pahar Mahadev Temple: Spanning 2.80 km in Cachar district to facilitate easier pilgrim transit up the hill temple.
- Jatinga Bird Watching Tower to Hempeupet Peak: A 3.50-km aerial line across Dima Hasao, expanding eco-tourism and nature exploration access.
- Agnigarh to Bhairabi Mandir: A 1.80-km line in Sonitpur district connecting two prominent cultural and spiritual landmarks.
Execution Timelines and Ground Progress
Progress varies across the newly approved network. Chief Minister Sarma noted that the 1.43-km connection between Kamakhya Railway Station and Kamakhya Temple has already achieved substantial ground advancement. Meanwhile, the remaining four proposed corridors are currently situated at the preliminary stage preceding the finalization of their Detailed Project Reports (DPR).



















