Pali Road Upgrade Begins on 8.5 Km Saleriya to Nadole Stretch Following Rs 8.50 Crore SanctionRajasthan
23 Sept 2026, 3:18 pm (1 hour ago)· 0

Pali Road Upgrade Begins on 8.5 Km Saleriya to Nadole Stretch Following Rs 8.50 Crore Sanction

Reconstruction work has commenced on the 8.5-kilometer damaged road connecting Saleriya and Nadole in Rajasthan's Pali district. Backed by an administrative sanction of Rs 8.50 crore, the project aims for completion within nine months.

Commuters and local residents traveling between Saleriya and Nadole in Rajasthan's Pali district are set to experience smoother journeys as extensive reconstruction work gets underway on the long-neglected transit stretch. The state administration has granted formal administrative and financial approval totaling Rs 8.50 crore to completely rebuild the 8.5-kilometer thoroughfare situated near Rani. Following the formal clearances, heavy earth-moving equipment and machinery have been deployed to strip away the weathered, broken asphalt layer and lay the groundwork for a modern roadway.

Eliminating Hazardous Potholes and Commuter Fatigue

For several years, the dilapidated state of the Saleriya to Nadole route posed persistent dangers to everyday travelers. Deep craters, broken edges, and blinding dust turned routine travel into a grueling ordeal, with two-wheeler riders regularly losing balance and suffering serious injuries that required hospital care. Beyond the severe safety hazards, the rough surface inflicted heavy wear and tear on vehicular components while inflating fuel expenses and travel times. The development of a newly paved surface is expected to eliminate these hazards, providing reliable connectivity and safeguarding daily travelers across the rural belt.

Also read

Nine-Month Deadline Established for Project Completion

Providing operational details on the infrastructure drive, Public Works Department Junior Engineer Jitendra Vyas from Rani confirmed that all contractual and tendering formalities have concluded. The executing agency has received the formal work order with strict parameters regarding build standards. The department has established a firm target of finishing the entire construction exercise within the next nine months, ensuring that residents receive a durable and fully functional transit link without unnecessary delays.

Boost Expected for Regional Trade and Community Links

The commencement of groundwork has been welcomed by village communities, market traders, and regular motorists across the region. Local residents expressed appreciation toward Marwar Junction legislator Kesaram Choudhary and the state government for addressing this critical regional demand. Community members noted that an upgraded corridor will not only curb fuel consumption and vehicle maintenance expenses, but will also accelerate local commercial transport and strengthen social connectivity between surrounding settlements.

Questions & Answers

What is the total budget sanctioned for the Saleriya to Nadole road project?
The state government has accorded administrative and financial sanction of Rs 8.50 crore for the complete reconstruction of the road.
What is the total length of the stretch being reconstructed?
The road located near Rani spans an overall length of approximately 8.5 kilometers.
What timeframe has been set for the completion of the roadwork?
The Public Works Department has instructed the executing agency to complete the construction within a nine-month deadline.
What issues were commuters facing on the previous road surface?
Travelers faced deep potholes and hazardous dust that caused frequent two-wheeler accidents, vehicular damage, and excessive fuel consumption.
Which official confirmed the progress of the tendering and execution order?
Public Works Department Junior Engineer Jitendra Vyas from Rani verified the completion of tenders and issuance of the work order.

Comments 4

Arjun Mehta@arjun-mehta·44m ago

The Saleriya to Nadole road has been broken for years, so it's a relief work has finally started. Will they actually finish it in nine months?

Ravikash Gupta@ravikash·44m ago

Arjun, let's hope it finishes in nine months, otherwise delays in road projects just inflate both vehicle maintenance costs and fuel expenses.

Karan Malhotra@karan-malhotra·1h ago

Better roads will greatly reduce the fear of accidents and highway crime during late-night travel, a much-needed relief.

Rohan Verma@rohan-verma·1h ago

Spot on, Karan. Traveling at night used to be risky with those massive potholes and fear of crime, at least this will make it much safer now.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp