Arunachal Pradesh Minister Ojing Tasing held comprehensive discussions with representatives of the East Siang Downstream Dam Affected People’s Forum (ESDDAPF) to address growing concerns surrounding the proposed 11,200-MW Siang Upper Multipurpose Project (SUMP). During the meeting, the minister placed strong emphasis on maintaining complete transparency and ensuring active public participation throughout the assessment phases of the infrastructure initiative.
Delegation Raises Downstream Concerns
The visiting delegation was led by forum president Oni Tamuk and general secretary Jobomchang Mengu, who detailed various pressing issues concerning downstream communities across 72 villages located within the East Siang district. These populations face potential environmental and livelihood disruptions stemming from the massive undertaking. Tasing noted that the session offered a constructive platform to review the project's Pre-Feasibility Report (PFR), directly address local apprehensions, and foster a clearer understanding of the initiative's long-term implications for residents living further down the river.
Building Public Trust and Transparency
In an official statement released after the discussions, the minister characterised the interaction as highly productive, allowing community delegates to openly voice their worries and aspirations. He asserted that any developmental venture of such immense national significance must progress hand in hand with the trust, confidence, and collective understanding of the local citizenry. Furthermore, he highlighted that open communication and mutual accountability remain indispensable pillars for establishing enduring public confidence.
Balancing Development and Welfare
Tasing maintained that the rights, legitimate interests, and overall concerns of grassroots communities must stay at the forefront of every consultation and policy decision. This approach guarantees that broad national development priorities advance simultaneously alongside the fundamental welfare of the people. The proposed SUMP is envisioned as a major hydropower and water-storage undertaking situated along the Siang River, carrying a projected generation capacity of approximately 11,200 MW.
Strategic Value and Energy Security
Authorities are carefully evaluating the project for its capacity to reinforce India's national energy and water security, effectively moderate seasonal flooding, and stimulate regional economic growth. The strategic importance of the installation is additionally tied to broader regional discussions regarding potential upstream interventions within the wider Brahmaputra basin. Recent unrest and subsequent arrests in the region have further underscored the delicate nature of public sentiments surrounding major infrastructural developments.
Environmental and Social Apprehensions
Despite its potential economic advantages, the initiative has triggered notable anxieties among segments of the local populace regarding possible adverse social and environmental consequences, particularly for downstream settlements. The ongoing PFR evaluation exercise is specifically designed to thoroughly test technical feasibility before any definitive construction decisions are finalized by authorities.
Minister's Social Media Message
Reinforcing his stance through a social media post, Tasing stated that projects of this magnitude must move forward with the collective understanding and confidence of the people. He reiterated his firm belief that transparency and dialogue remain vital to ensuring that national progress and community well-being advance together without friction.























