Government personnel working under the Prime Minister's package across the Kashmir Valley have marked a major housing milestone with the handover of keys to 936 newly built transit flats. Constructed in Srinagar's Zewan area, the residential units address longstanding security appeals by bringing employees together from scattered, rented private accommodations into designated, secure complexes.
Infrastructure Details of the Zewan Residential Complex
The newly allotted site at Zewan comprises 39 individual blocks built to modern civic standards. Each structure is designed with a ground floor plus 5 storeys, housing 4 flats per floor for a total density of 24 units in each block. The residential layout offers functional two-room apartments equipped with a dedicated kitchen, bathroom, and balcony. To ensure ease of access across all upper levels, passenger elevators have been installed throughout every building block.
Simultaneous Expansions Across Kupwara, Budgam, and Kulgam
Alongside the handover of keys in Srinagar, wider residential additions have become operational across several valley districts. A total of 480 transit flats across 69 blocks located in Kupwara, Budgam, and the Baag area of Kulgam were formally inaugurated by Lieutenant Governor Manoj Sinha on Sunday. These complementary facilities ensure that employees deployed across diverse regional administrative offices have direct access to consolidated housing close to their work postings.
The Impetus Behind Gated Cluster Housing
Roughly 6,000 employees are currently serving across various public departments in the Kashmir Valley, with the heaviest concentration based in Srinagar and Budgam. For years, these individuals resided in private rental homes spread across disparate municipal neighborhoods. Following the targeted killing of employee Rahul Pandit in 2020, personnel voiced severe safety apprehensions and staged public protests demanding unified transit townships. Community members maintain that shared, gated cluster living significantly bolsters confidence, strengthens communal resilience, and mitigates the danger of isolated targeted attacks.
Valley-Wide Construction Progress Under Mission Mode
The broader transit housing initiative has been executed on a mission mode since 2020 to provide robust living quarters for all package personnel. Across 10 districts of the valley, the comprehensive blueprint outlines 342 blocks distributed over 20 separate sites, designed to yield an aggregate of 6,000 residential flats. Construction progress has reached an advanced stage, with over 5,200 apartments already finished and more than 3,800 units handed over to verified staff members.
























