Raithal-Basri Road Upgradation Begins in Jaipur Rural with Rs 5.25 Crore InvestmentRajasthan
20 Sept 2026, 6:17 am (21 min ago)· 1

Raithal-Basri Road Upgradation Begins in Jaipur Rural with Rs 5.25 Crore Investment

Construction work has officially started on the 3.5-kilometer Raithal-Basri road under MDR-467 in Jaipur Rural with an outlay of Rs 5.25 crore. The route will improve daily commuting across three assembly constituencies.

Ground-level construction has commenced on a crucial infrastructure project aimed at upgrading rural connectivity in Jaipur Rural. The long-standing demand of local residents in the Raithal area is finally turning into reality as work begins on a 3.5-kilometer road stretch connecting Raithal and Basri. Designated under MDR-467, the engineering project involves a total financial allocation of around Rs 5.25 crore overseen by the Public Works Department. This initiative will replace an eroded route with a modern paved corridor, resolving decades of transportation hardship.

Project Budget and Technical Scope

Rajat Sharma, assistant engineer at the Public Works Department in Jalsu, stated that an amount of Rs 5.25 crore has received formal sanction specifically for developing the 3.5-kilometer segment of the Raithal-Basri roadway. Following the clearance of procedural and budgetary approvals, workforce and construction machinery have been deployed on site to execute the physical work. Once completed, the rebuilt corridor will significantly streamline travel conditions, making daily vehicular movement much smoother and safer than before.

Also read

Strategic Link Across Three Assembly Constituencies

Bhagwan Sahay Yadav, administrator of the Raithal Gram Panchayat, explained that the state government granted sanction for the roadway following representations made by Amber MLA Prashant Sharma. This route holds significant regional importance because it directly links commuters traveling across the Amber, Jhotwara, and Phulera assembly constituencies. By establishing a robust artery between these jurisdictions, the project will seamlessly connect multiple adjoining villages and modernize the rural road network.

A Decade-Long Wait Concludes for Residents

Villagers pointed out that community petitions demanding the construction of the Raithal-Basri route had been continuously raised for approximately 10 years. During this ten-year period, commuting over the degraded stretch caused regular inconvenience to residents, especially students, healthcare patients, and elderly citizens. Even after official project clearance was granted, locals were eagerly anticipating the actual commencement of ground operations. The visible deployment of roadwork equipment has now brought widespread optimism across the region.

Economic Boost for Farmers, Commuters, and Trade

The functional completion of this corridor is poised to bring broad practical advantages to daily life and the rural economy. Local farmers will be able to transport their agricultural harvest, dairy, and produce to regional commercial markets without facing transit damage or delays. Similarly, regular commuters, office workers, and students will enjoy reliable, punctual transport. Enhancing direct connectivity between village settlements and major secondary highways will save travel time, lower vehicle maintenance costs, and accelerate local commercial growth.

Questions & Answers

What is the total expenditure sanctioned for the Raithal-Basri road project?
A total budget of Rs 5.25 crore has been approved and allocated by the Public Works Department for this project.
Under which road classification is this stretch being constructed?
The 3.5-kilometer segment is being constructed as part of MDR-467.
How long have local residents been demanding this road construction?
Local villagers had been petitioning for the reconstruction of this route for roughly 10 years.
Which assembly constituencies will benefit directly from this roadway?
The route directly links and serves commuters across the Amber, Jhotwara, and Phulera assembly constituencies.
What is the total length of the newly initiated road?
The total length of the Raithal-Basri road section under construction is 3.5 kilometers.

Comments 0

No comments yet — be the first.

Citizen journalism

Become a TrendKia journalist

Voice of the people

Share news, photos and videos from your area with TrendKia and let your voice reach the nation. Every citizen a journalist.

Join now
CH 01 LIVE
TrendKia TV ON AIR
Chamar no WhatsApp